Sentences with phrase «require higher levels of power»

Not exact matches

Actual results, including with respect to our targets and prospects, could differ materially due to a number of factors, including the risk that we may not obtain sufficient orders to achieve our targeted revenues; price competition in key markets; the risk that we or our channel partners are not able to develop and expand customer bases and accurately anticipate demand from end customers, which can result in increased inventory and reduced orders as we experience wide fluctuations in supply and demand; the risk that our commercial Lighting Products results will continue to suffer if new issues arise regarding issues related to product quality for this business; the risk that we may experience production difficulties that preclude us from shipping sufficient quantities to meet customer orders or that result in higher production costs and lower margins; our ability to lower costs; the risk that our results will suffer if we are unable to balance fluctuations in customer demand and capacity, including bringing on additional capacity on a timely basis to meet customer demand; the risk that longer manufacturing lead times may cause customers to fulfill their orders with a competitor's products instead; the risk that the economic and political uncertainty caused by the proposed tariffs by the United States on Chinese goods, and any corresponding Chinese tariffs in response, may negatively impact demand for our products; product mix; risks associated with the ramp - up of production of our new products, and our entry into new business channels different from those in which we have historically operated; the risk that customers do not maintain their favorable perception of our brand and products, resulting in lower demand for our products; the risk that our products fail to perform or fail to meet customer requirements or expectations, resulting in significant additional costs, including costs associated with warranty returns or the potential recall of our products; ongoing uncertainty in global economic conditions, infrastructure development or customer demand that could negatively affect product demand, collectability of receivables and other related matters as consumers and businesses may defer purchases or payments, or default on payments; risks resulting from the concentration of our business among few customers, including the risk that customers may reduce or cancel orders or fail to honor purchase commitments; the risk that we are not able to enter into acceptable contractual arrangements with the significant customers of the acquired Infineon RF Power business or otherwise not fully realize anticipated benefits of the transaction; the risk that retail customers may alter promotional pricing, increase promotion of a competitor's products over our products or reduce their inventory levels, all of which could negatively affect product demand; the risk that our investments may experience periods of significant stock price volatility causing us to recognize fair value losses on our investment; the risk posed by managing an increasingly complex supply chain that has the ability to supply a sufficient quantity of raw materials, subsystems and finished products with the required specifications and quality; the risk we may be required to record a significant charge to earnings if our goodwill or amortizable assets become impaired; risks relating to confidential information theft or misuse, including through cyber-attacks or cyber intrusion; our ability to complete development and commercialization of products under development, such as our pipeline of Wolfspeed products, improved LED chips, LED components, and LED lighting products risks related to our multi-year warranty periods for LED lighting products; risks associated with acquisitions, divestitures, joint ventures or investments generally; the rapid development of new technology and competing products that may impair demand or render our products obsolete; the potential lack of customer acceptance for our products; risks associated with ongoing litigation; and other factors discussed in our filings with the Securities and Exchange Commission (SEC), including our report on Form 10 - K for the fiscal year ended June 25, 2017, and subsequent reports filed with the SEC.
By the way, hasn't Ajayi the required levels of physic, strength, needed - height, age - maturity, pace, hard - tackling ability, ball - winning, holding - the ball, good aeriel - power, dribbling - skills, stamina, tactical sense, accurate - passing of the ball (short and long) and high level of concentration.
Pace and power in the front line is required at the highest level, so it's proved they bring the best out of each other.
Saying that «information is power,» a state Supreme Court judge today upheld a measure in New York City requiring some restaurants to warn consumers about high levels of sodium in foods.
In twenty reactor tests, a wide range of thrust levels were demonstrated, along with high - temperature coated particle and composite fuel, sustained engine operation, accumulated time at full power, and restart capability — everything required for a human mission to Mars.
The Power Clean technique requires high skill levels and in most cases a state of non-fatigue (or at least very little fatigue).
Normally, this level of power output would require a correspondingly high increase in fuel consumption.
The high torque of 390 Nm in total (287.64 lb - ft)-- 240 Nm (177.01 lb - ft) from the 1.4 TFSI plus an extra 150 Nm (110.63 lb - ft) from the electric motor — is transformed into the required level of tractive power when accelerating.
The electric motor on the Citaro hybrid assists the combustion engine when high levels of power are required, particularly when moving off.
This ensures that the high torque of 440 Newton metres in total — 240 Nm from the 1.4 TFSI plus an extra 200 Nm from the electric motor — is transformed into the required level of tractive power when accelerating.
The engine drives a generator that produces power as required while driving to maintain a constant level of charge in the high - voltage battery.
Your Exo - Rig's power core level is utilised to overcharge certain electrical circuits in order to open large heavy doors that lead to previously inaccessible areas; ranging from level 10 overcharges that will immediately be able to be opened, while some require a bit of upgrading to level 11 or 12, although there are some doors that need as high as a level 55 power core before being opened.
But it turns out that countries with far higher levels of so - called variable renewables are doing without capacity markets at all, finding that other measures are sufficient, such as investing in transmission capacity, reforming power markets and requiring renewable energy technologies themselves to play a bigger role in meeting power demand.
A useful investigation will require the investigator to possess (1) a sophisticated knowledge of the climate science issues involved, (2) a similar knowledge of IT systems, (3) a very high level of investigative skill and experience and (4) the capacity to access all the relevant information, which probably includes subpoena power and the ability to take testimony under oath.
- GB settings: — reworked image choosing / cropping - supports Google Photos and potentially other gallery apps — added automatic clean up of GB app picker cache (saves storage space)- Lockscreen status bar lock policy: option to allow status bar expand on secured lock screen — allows peeking on notifications even if lock screen is secured — access to quick settings prohibited — makes UNC ActiveScreen «expand notification panel» mode work on secured lock screen - Display tweaks: — added option for emulating battery charging light: ------ allows charging light on devices lacking native support (e.g. Nexus 5)------ pending notification light has priority over charging light ------ charging light color changes lineary according to current battery level (requires RGB LED hardware)------ whether led is constantly ON or «breathing» depends on LED driver (can not be affected by GB)-- button backlight notifications adjusted to follow Pulse notification delay - Power tweaks: added option for proximity wake up (prevents accidental wake up)(Android 4.2 + only)- Recents panel: allow live wallpaper on high end GFX devices (no option; Android 4.2 + only)- Updated Japanese translation (thanks to WedyDQ10)- Updated French translation (thanks to ch - vox)- Updated Chinese (Simplified) translation (thanks to liveasx)- Updated Chinese (Traditional) translation (thanks to momomok)- Updated Polish translation (thanks to xtrem007)- Updated Russian translation (thanks to gaich)- Updated Portuguese (PT) translation (thanks to bgcngm)- Updated Spanish translation (thanks to jvbferrer)- Updated Slovak and Czech translations
The difficulty concern is the biggest flaw in the blockchain network with the high demand of the miners mining raising the difficulty level of solving the block for completing verifying the transaction as a result required miner with increasing computing power.
a b c d e f g h i j k l m n o p q r s t u v w x y z