Cara Benson with Save East Greenbush: «As this parcel is a zoned residential buffer, we think the developers are finally realizing that getting this project through the required planning, zoning and
required environmental review processes just isn't going to be possible.»
Not exact matches
One common concern expressed is how a
required state
environmental review, which can involve a lengthy public comment period, will fit in with the
process.
Hawkins has long faulted Cuomo's DEC for failing to
require a formal
environmental review of the expansion of oil shipments and crude oil boiler
processing at the Port of Albany, which will total an estimated 2.8 billion gallons of crude oil annually.
Under the New York State
Environmental Quality Review (SEQR) process, the Town Board is required to review the potential environmental effects of a project, identify the ways to mitigate the unavoidable impacts and balance the environmental impacts with the benefits that will be achieved by the prop
Environmental Quality
Review (SEQR) process, the Town Board is required to review the potential environmental effects of a project, identify the ways to mitigate the unavoidable impacts and balance the environmental impacts with the benefits that will be achieved by the proposed pr
Review (SEQR)
process, the Town Board is
required to
review the potential environmental effects of a project, identify the ways to mitigate the unavoidable impacts and balance the environmental impacts with the benefits that will be achieved by the proposed pr
review the potential
environmental effects of a project, identify the ways to mitigate the unavoidable impacts and balance the environmental impacts with the benefits that will be achieved by the prop
environmental effects of a project, identify the ways to mitigate the unavoidable impacts and balance the
environmental impacts with the benefits that will be achieved by the prop
environmental impacts with the benefits that will be achieved by the proposed project.
Instead, he might be considering a change to the
environmental review process that is
required before new mines can be approved.
Aug. 2017: Tens of thousands of Bay Area and California residents voice opposition to the proposed Phillips 66 SF Bay marine terminal expansion by submitting comments on the initial scoping of the project under
review processes required by the California
Environmental Quality Act.
Toyota Engineering and Manufacturing North America (Princeton, IN) 10/2001 — 5/2010 Technician / Skilled Maintenance Team Leader • Provided support and technical expertise on Allen Bradley PLC - 5 and Control Logic, as well as designed new screens for HMI using RSView and mapped all data and alarms needed for monitoring production equipment • Programmed PLC's using Rockwell software as
required by production, utilizing PLC as a troubleshooting tool to locate and repair
process problems • Repaired and maintained all three phase medium and low voltage motors, programming medium voltage control relays to meet manufacturer specifications and monitor applicable data from motors as well as engineering data and motor manufacturing parameters into VFD's • Established PM schedules for maintaining floor conveyors, robots, RFID, air handling, sludge, paint mix room, and lifters, assisting T / M's with performing preventative maintenance on equipment • Ensured calibration of
environmental equipment to maintain state and federal guidelines, performing the calibration procedures and repair of micrometers, calipers, and profilometers as
required by ISO standards • Identified and developed countermeasures to manufacturing - related problems with equipment, monitoring corrective actions and resolution implementation to ensure problems were below 2 % of operational availability •
Review associated work instructions for changes as needed to maintain quality, safety, and
environmental standards, while planning and coordinating weekly safety meetings and training for team members