A detailed and supported cost approach to value is
required on all Manufactured Home appraisals.
Not exact matches
Materials such as the al - Qaeda
manufactured manual how to «Make a Bomb in the Kitchen of Your Mom» have become
required reading for
home - grown jihadists, while old classics such as «The Anarchist Cookbook» and the «The Poor Man's James Bond» are often discovered
on hard - drives of far - right violent extremists.
In the state of CA, a mobile
home (pre June 1976) can be converted to a «fixture improvement
on real property», however, FHA / FNMA guidelines
require a «
Manufactured home» (built post June 1976).
Most lenders
require that to lend
on a
manufactured home, they are looking to see that you own the land and that the
home has no wheels and is permanently installed
on a concrete pad... it is still a
manufactured home though.
If an appraisal / inspection will be
required, always make the offer contingent
on a favorable outcome of either an appraisal or inspection of the
manufactured home.
A:
Manufactured home sales normally take 2 - 3 weeks, depending
on if an appraisal is
required.
If you build a tiny house
on a trailer and have it licensed as a
manufactured house, you can only replace an existing single - wide that was put
on the property before they
required all mobile
homes to come in two sections.
If you take out a mortgage loan to make a purchase, your lender may
require you to carry certain types of insurance
on your mobile or
manufactured home.
If you are still making mortgage payments
on your mobile or
manufactured home, your lender most likely
requires you to carry insurance
on it.
When a listing had easy access at main road intersections
requiring only a few OH signs, I realized that many people in my blue colour town worked shifts — at Nortel, Chrysler, and at local
manufacturing and warehouse facilities bordering residential areas, so I decided to have «
on your way
home» open houses, both 7:30 to 9 am and at 4 - 6 pm.