I understand there were already
school buildings on the site.
Not exact matches
The collapse poses a headache for Theresa May's government, which had employed Carillion to work
on 450 projects including the
building and maintenance of hospitals,
schools, defence
sites and a high - speed rail line.
With YouTube blocked
on his
school computers, Lunny
built a
site that would allow his fellow students to access the popular video - sharing platform.
District 181 had preferred to
build the
school along Chicago Avenue
on the north side of the park instead of along Norfolk Avenue
on the south side
on the
site it owns.
The Park District plans to partner with Lemont Township High
School to
build four baseball fields, three football fields, two soccer fields, parking for 200 to 300 cars, a cross-country track and a locker room and concession
building on the
site.
In approving the Nitti subdivision, a planned development of 56 new homes to be
built on the
site of the former Elmhurst Hospital
site on Berteau, Elmhurst city council members also approved substantial increases in impact fees that will add $ 10,100 to the cost of a house in the subdivision and generate $ 470,000 for Elmhurst
schools and $ 95,000 for the Park District.
The
school and park
site will be
built on land donated by the developers of two proposed new subdivisions, Laraway Ridge and Windermere Lakes.
Since the space - starved Park District will not buy the
building on Washington Street, the
school likely will be demolished when a new kindergarten center is
built on the
site next year.
Because of traffic and other concerns, residents and Park Board members have said previously that the Chicago Avenue
site would be better than
building a
school on Norfolk.
But two weeks ago the
school district informed the park district that a vacant 4.5 - acre
site owned by the
school district is sufficient land
on which to
build the
school.
The old
school building, which housed the Senior Center, was scheduled for demolition by School District 25 during the rebuilding of South Middle School on the same
school building, which housed the Senior Center, was scheduled for demolition by
School District 25 during the rebuilding of South Middle School on the same
School District 25 during the rebuilding of South Middle
School on the same
School on the same
site.
The future of a second Emerson
School of Hospitality is uncertain, after Buffalo
School Board members declined to vote yesterday
on Superintendent Kriner Cash's recommendation to
build a satellite program
on a
site downtown near the existing campus.
If you go to all the
schools, the hospitals, the roads, the water projects and everything we are
building, it is Ghanaians I see working
on these
sites.
The future of a second Emerson
School of Hospitality is uncertain, after Buffalo
School Board members declined to vote Wednesday
on Superintendent Kriner Cash's recommendation to
build a satellite program
on a
site downtown near the existing campus.
Off the top of my head the biggest ones are: (1) corruption within the
Buildings & Grounds Department (2) corruption involving
school district vendors over-billing and paying bribes and kickbacks that led to those two Federal indictments and convictions; (3) corruption involving police harassment of a woman
on behalf of the manager of a local beach club; (4) a child rapist operating out of a public middle
school; (5) an illegal gambling and pornography web
site operated by members of the New Rochelle Police Department; (6) a retired police officer defrauding charities including St. Jude's Children's Research; (7) illegal asbestos handling and asbestos removal at an elementary
school; (8) an effort to artificially inflate the salaries and pensions of senior police commanders; (9) the relationship between the New Rochelle Police Commissioner and a corrupt contractor, a man who has since been convicted
on Federal corruption charges; (10) the sordid history of former New Rochelle
Schools Administrator Freddie Dean Smith.
Community Board member Helen Rosenthal gathered more than 1,300 signatures asking Extell to
build a six section K - 8
school on the
site.
Jacobs said that includes improvements to the Scajaquada Expressway, extending Metro Rail to the DL&W Terminal, redevelopment of the former Bethlehem Steel
site, $ 10 million for Say Yes to Education, $ 20 million to expand class sizes at the University at Buffalo medical
school and $ 20 million to
build a Visitor Welcome Center
on Grand Island, among other capital projects.
One of his suggestions included
building an elementary
school on the
site as well as a new annex location for P.S. 8, a highly sought - after
school in Brooklyn Heights.
It included an 18 - acre section of the Teleport
site in Travis — which currently hosts office
buildings and three
schools — as well as a
site on Arthur Kill Road in Charleston.
Day and supporters of his proposals gathered just outside the Estates at Sky View development, where the Hershkowitz family is
building 20 single family homes
on a
site that is just east of the Palisades Interstate Parkway in the town of Ramapo and the East Ramapo
school district.
Topics included his reaction to Governor Cuomo's statement that he is not planning to approve a specific amount of pre-K funding set forth in the state senate proposed budget, how confident he is of pre-K funding, the status of his administration's review of the city's Sandy relief programs, his reaction to Governor Cuomo's statements
on mayoral control of the city
school system and charter
schools, the current status of
site clearing and the investigation into the cause of the East Harlem
building explosion, whether New Yorkers should be concerned about gas leaks, his reaction to a tweet yesterday by Council Speaker Melissa Mark - Viverito critical of Governor Cuomo's reaction to the East Harlem
building explosion, how the church services he attended this morning for victims affected him personally and the relief efforts being led by his wife, Chirlane McCray, and the Mayor's Fund for NYC.
Manhattan Borough President Scott Stringer criticized the Commission for not ratifying two changes he had negotiated for the southern block of the
site: a elimination of part of the
building planned for the southeast corner to «protect light and air» for locals and the removal of one story beneath the planned elementary
school site on the northwest corner.
In de Blasio's official statement
on Riverside Center, the five - tower development Extell wants to
build, he said he's lending «conditional support» to the project — but only if Extell provides 150,000 square feet of
school space
on the
site.
As part of the scheme Elliott will be responsible for
building a new
school on each of the existing
sites using a modular construction solution.
In the absence of a dedicated
on -
site professional developer,
schools build capacity through distributive PD that taps its own faculty as mentors.
For example, the
Building Schools for the Future programme resulted in many school caretakers and site managers needing to learn new technical knowledge on building c
Building Schools for the Future programme resulted in many
school caretakers and
site managers needing to learn new technical knowledge
on building c
building controls.
Eden's focus
on the importance of outdoor learning and play can be seen throughout the work of the project as well as through the
schools education team, with the ever - popular den
building activities that take place in the project's arena during the summer and the landscaping and design of the play areas and gardens around the
site.
So, ensuring the safety and health of everyone who uses the
school site requires a huge amount of thought and planning, whether it is practicing fire evacuations or keeping an eye
on the weather, and needs the
building of a culture where everyone takes responsibility.
Additionally,
on the topic of rising pupil numbers, modular
buildings hold the easy possibility of extension and the capability to be easily moved, far more suitable to a changing
school site than a traditional construction.
The design
builds on the
site's history as a farm, with an informal typology to deliver a series of distinct yet coherent architectural components echoing the
school's agricultural past.
A # 5.6 million project to provide a new
building for the 480 - place Pyrford Primary
School near Woking has started
on site.
The project was delivered
on time in a challenging timescale despite exceptionally high levels of rainfall during the programme, and the green field
site immediately adjacent to the original
school was highly constrained which made the
building installation phase more complex.
From humble beginnings in 2001 (
built on the
site of a former junkyard), this small
school with deep cultural roots and values is now «thriving».
But having hundreds of students and staff moving around a
school building at the same time that contractors are
on site need not cause hazards, as long as the right procedures are in place.
Building on the success of youth - focused, anti-tobacco campaigns that expose industry tactics, educators can also boost
school efforts to prevent underage drinking by having high -
school students use the
site to research the «tricks» of the alcohol industry.
The scheme includes new
school buildings to the front of the Simon Balle
school site offering accommodation for the primary aged pupils along with outdoor play facilities, improved
on -
site car parking with a revised in and out scheme and an
on -
site drop off area.
Having tutors living
on -
site had a number of benefits, not least of which was that the
school could
build its schedule around tutoring — every Match student would have two hours of tutoring each day, which meant that tutors were working throughout the day and could continue to work with students after
school, as needed.
Based
on this evidence one
school decided to re-arrange its» out of
school activities so that it only had to heat and light one part of the
school buildings rather than the whole
site saving a considerable amount of money and carbon.
A well - designed smoke control system for
schools can not only protect the occupants within the
building but improve external efforts from local firefighters and
on -
site operations.
There are six available modules that can also be combined with the base package to
build a more tailored support solution, these are: • Vision and Strategy — quarterly consultancy from Stone Group and Stone's Education Specialists
on how to integrate ICT into the school's plan • Security — complete back - up solution and anti-virus software • Engagement — technical or pedagogy focused training for staff to maximise benefits and return on investment • Monitoring — proactive remote monitoring service, in combination with helpdesk support • On - site service — regular visits from a dedicated Stone Group technician to provide hands on help and support • Communication — enabling primary schools to benefit from the latest email, instant message, voice, and video communication and collaboration tool
on how to integrate ICT into the
school's plan • Security — complete back - up solution and anti-virus software • Engagement — technical or pedagogy focused training for staff to maximise benefits and return
on investment • Monitoring — proactive remote monitoring service, in combination with helpdesk support • On - site service — regular visits from a dedicated Stone Group technician to provide hands on help and support • Communication — enabling primary schools to benefit from the latest email, instant message, voice, and video communication and collaboration tool
on investment • Monitoring — proactive remote monitoring service, in combination with helpdesk support •
On - site service — regular visits from a dedicated Stone Group technician to provide hands on help and support • Communication — enabling primary schools to benefit from the latest email, instant message, voice, and video communication and collaboration tool
On -
site service — regular visits from a dedicated Stone Group technician to provide hands
on help and support • Communication — enabling primary schools to benefit from the latest email, instant message, voice, and video communication and collaboration tool
on help and support • Communication — enabling primary
schools to benefit from the latest email, instant message, voice, and video communication and collaboration tools.
However, we do have a responsibility to find
sites that meet the specific needs of
schools and all technical matters, including key areas such as how the
buildings will be able to work properly
on the
site, transport and highways issues, flood matters, other elements of planning policy form part of the criteria when deciding if a
site is suitable or not.
Amthal has worked directly with the
school to update its intruder system and integrate CCTV and access control solutions, which can easily be added to as and when the
school adds new, often prefabricated,
buildings on site.
At the same time the governors of the
school, which occupies a 17 - acre
site in a beautiful location in open country
on the edge of the town, also had plans to
build a full size artificial pitch for its students.
These benefits of carrying out much of the construction work away from the
school site are hugely beneficial to
schools as it reduces the amount of disruption any
building project can cause and importantly allows a faster completion time when
on site.
Indeed, many
schools that embrace technology to drive personalized learning have actually moved in the opposite direction: extending the
school day to
build in time for students to do more project - and team - based learning, meet one -
on - one with teachers and advisors, and even just access
on -
site wireless Internet.
Architects Barnsley, Hewitt and Malinson designed it to fit harmoniously with the oldest
building on the
school site, and a host of environmental features include a ground - source heat pump, underfloor heating and rainwater recycling.
Carmel Clay
Schools, a district north of Indianapolis
built two
on -
site centers and plans several more.
A number of
schools that were guaranteed to London for 2016 still haven't opened their doors — some haven't even found a
site to
build on.»
To try and generate additional income, 42 per cent of
school leaders report letting
school buildings, 10 per cent admit to setting up
on -
site nursery provision, and 25 per cent are linking up with nearby
schools to share catering or cleaning contracts.
The new
school will be run by the Harris Foundation and is expected to be
built on a
site on private land near Merantun Way, although the exact location has not yet been disclosed.