Sentences with phrase «screed floor»

I love the interior of Blueberry Hill — although an enormous space, the comfy furniture, screed floor and during winter, log fire makes it a homely, welcoming spot.

Not exact matches

Industrial flooring is one of those reliable companies that help you to give reliable floor repairing, screeding, painting, coating services at reliable rates within your budget.
Before a new floor covering can be laid, allowing the building to be used as before, the screed has to be replaced or dried.
Ground floor: 75 mm screed on 300 mm Kore EPS, on 75 structural screed on 200 precast hollowcore suspended floor.
After: 200 mm Ballytherm PIR insulation under new 75 mm concrete floor screed.
The floor was insulated with 200 mm of Ballytherm PIR insulation beneath a 75 mm screed, while 400 mm of Isover Metac insulation was installed in the roof on the flat.
The building was constructed from a factory - built timber frame system insulated with polyurethane, with a Quinn Lite subfloor, while the ground floor features 250 mm of Kingspan TF70 insulation under the concrete screed
Client: Hugh Whiriskey Project management, M&E and civil engineering: Corbwell Design Contractor: GreenTec Eco Homes Mechanical contractor: EIL Windows and doors: True Windows Cellulose insulation: Ecocel Wood fibre insulation: Partel Floor insulation: Kingspan Cavity wall insulation: Eurobead Airtightness products & wall ties: Partel Thermally broken balcony connector: Schöck Thermal blocks: Thermal Insulation Distributors Ltd Heat pump: Unipipe Heat recovery ventilation: Dimplex Renewables GGBS: Ecocem Floor screed: Egan Screeding
Ground floor: Insulated raft foundation consisting of 200 mm Aeroflor EPS300, 250 mm concrete, 80 mm Kingspan TF70 insulation (containing ventilation ductwork channels), 60 mm Sika Viscocrete screed (containing underfloor heating), Bambeau Solid 3SF bamboo flooring.
Underfloor heating pipes in concrete screed, polished concrete floor finish.
Overall U-value: 0.58 Floor Before: Original suspended floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DAFloor Before: Original suspended floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DAfloor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DAfloor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA - S.
If this isn't the case, you'll either have to take up existing flooring and lay new — screed is best with the underfloor system laid on top — or add a floating floor to accommodate the piping.
Prepare your subfloor (plywood / screed) and acclimatise the flooring in the room for 24 hours prior to fitting.
a b c d e f g h i j k l m n o p q r s t u v w x y z