I love the interior of Blueberry Hill — although an enormous space, the comfy furniture,
screed floor and during winter, log fire makes it a homely, welcoming spot.
Not exact matches
Industrial
flooring is one of those reliable companies that help you to give reliable
floor repairing,
screeding, painting, coating services at reliable rates within your budget.
Before a new
floor covering can be laid, allowing the building to be used as before, the
screed has to be replaced or dried.
Ground
floor: 75 mm
screed on 300 mm Kore EPS, on 75 structural
screed on 200 precast hollowcore suspended
floor.
After: 200 mm Ballytherm PIR insulation under new 75 mm concrete
floor screed.
The
floor was insulated with 200 mm of Ballytherm PIR insulation beneath a 75 mm
screed, while 400 mm of Isover Metac insulation was installed in the roof on the flat.
The building was constructed from a factory - built timber frame system insulated with polyurethane, with a Quinn Lite subfloor, while the ground
floor features 250 mm of Kingspan TF70 insulation under the concrete
screed
Client: Hugh Whiriskey Project management, M&E and civil engineering: Corbwell Design Contractor: GreenTec Eco Homes Mechanical contractor: EIL Windows and doors: True Windows Cellulose insulation: Ecocel Wood fibre insulation: Partel
Floor insulation: Kingspan Cavity wall insulation: Eurobead Airtightness products & wall ties: Partel Thermally broken balcony connector: Schöck Thermal blocks: Thermal Insulation Distributors Ltd Heat pump: Unipipe Heat recovery ventilation: Dimplex Renewables GGBS: Ecocem
Floor screed: Egan Screeding
Ground
floor: Insulated raft foundation consisting of 200 mm Aeroflor EPS300, 250 mm concrete, 80 mm Kingspan TF70 insulation (containing ventilation ductwork channels), 60 mm Sika Viscocrete
screed (containing underfloor heating), Bambeau Solid 3SF bamboo
flooring.
Underfloor heating pipes in concrete
screed, polished concrete
floor finish.
Overall U-value: 0.58
Floor Before: Original suspended floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA
Floor Before: Original suspended
floor (and solid floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA
floor (and solid
floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA
floor in kitchen) with carpets After: Compacted and blinded hardcore sub-base, Primary DPM, 300 mm Platinum EPS at 0.030 conductivity, second DPM / separating layer, 100 mm concrete slab on blinded sub-base, 40 mm floating
screed laid directly onto slab, Membranes and slab taped and sealed to wall plaster using Pro Clima products including DA - S.
If this isn't the case, you'll either have to take up existing
flooring and lay new —
screed is best with the underfloor system laid on top — or add a floating
floor to accommodate the piping.
Prepare your subfloor (plywood /
screed) and acclimatise the
flooring in the room for 24 hours prior to fitting.