Sentences with phrase «section recovery any day»

But when people tell me want to have a scheduled c - section because they're afraid to experience the pain of labor, I inwardly think that I would've taken the pain of contractions over the pain of a c - section recovery any day.

Not exact matches

I had just given birth a few days ago, following a c - section that, while planned, had led to an excruciating recovery process, to the point that I could not reach for the remote control to change the channel to Revenge Body With Khloe Kardashian without shrieking like a wounded bat.
Some doctors also are concerned about the short recovery time hospitals give new mothers: only 24 hours after a routine vaginal delivery and three days after Caesarean section.
§ Model policy elements are 1) in - service training, 2) prenatal breastfeeding classes, 3) asking about mothers» feeding plans, 4) initiating breastfeeding within one hour of uncomplicated vaginal birth, 5) initiating breastfeeding after recovery for uncomplicated Cesarean sections and / or showing mothers how to express milk and maintain lactation if separated from infant, 6) giving only breast milk to breastfed infants, 7) rooming - in 24 hr / day, 8) breastfeeding on demand, 9) no pacifier use by breastfed infants, 10) referral of mothers with breastfeeding problems and / or referral of mothers to appropriate breastfeeding resources at discharge.
She chronicles some of the reconstruction projects in the Sri Lanka — Relief and Recovery section of her Web site Every Day is Sunday.
Second, public schools are eligible to earn funding for a full day if they provide at least 43,200 minutes (4 hours per day) of instructional time to students enrolled in (1) a dropout recovery school; (2) an alternative education program; (3) a school program located at a day treatment facility, a residential treatment facility, psychiatric hospital, or medical hospital; (4) program offered at a correctional facility, or (5) a charter school providing adult high school diplomas or industry certification under Section 29.259.
Where appropriate, participants also considered whether missions in the Earth science decadal survey mission set might enable the recovery of the NPOESS climate measurements.11 As on day 1, templates were filled in during the breakout sessions, and they are available online.12 After the workshop a short background section was added to each breakout session summary to provide context for the discussions.
Section 44 (10) of the Municipal Act, provides that no action shall be brought against a municipality for the recovery of damages from a sidewalk slip and fall unless within 10 days after the occurrence of the injury, written notice of the claim has been provided.
Smartronix (CA & MD) 08/2004 — 12/2008 S6 Information Systems Coordinator • Serve as Section Chief and Contract Lead at the MCNOSC providing overall support for the MCNOSC IT Systems • Manage the network, servers, switches, applications, and information and infrastructure security • Utilize DoD applications for network scanning and remediation of the classified and unclassified networks • Develop plans, procedures, and policies to directly support and defend the MCNOSC Network from security threats • Oversee the MCNOSC's PKI (public key infrastructure) and integration with the MCNOSC services with the coordination of recovery strategies with the Alternate Network Operations and Security Center (AltNOSC) • Determine minimum processing requirements for recovery site and provide guidance for recovering infrastructure processing • Provide technical input to the Contingency of Operations (COOP) Plan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learned)
a b c d e f g h i j k l m n o p q r s t u v w x y z