(C) The probability that a negative precipitation anomaly and a positive temperature anomaly
equal to or exceeding a given
magnitude occur in the same 12 - mo period, for all possible 12 - mo periods (using a 12 - mo running mean;
see Materials and Methods), for varying severity of anomalies.