Not exact matches
Cleaner burning natural gas has been replacing aging coal
power plants in droves over the past
several years thanks to both economics and environmental reasons.
COR development is a real estate company that's worked on
several high profile - projects
in Syracuse, and CPV is an energy company that owns a
power plant in the Hudson Valley.
Aides to the governor have been trying for
several weeks to dissuade Entergy from closing one of them, the James A. FitzPatrick Nuclear
Power Plant in Oswego County.
It was a reference — borrowed, as noted
several times
in the trial, from «The Sopranos» TV show — to more than $ 300,000
in payments allegedly steered Percoco's way from a Syracuse development firm and an energy company with a
power plant interest before the state.
Percoco, who served as the governor's executive secretary, is accused of taking more than $ 600,000
in bribes from an energy company that needed state approval to build a
power plant in the Hudson Valley and an upstate developer that received
several state contracts.
That cash allegedly bought «official actions» that favored those two firms: COR Development, a real - estate - development firm that was awarded
several state contracts, and Competitive
Power Ventures Holdings LLC, an electric - power company that needed state approval to build a power plant in the Hudson Va
Power Ventures Holdings LLC, an electric -
power company that needed state approval to build a power plant in the Hudson Va
power company that needed state approval to build a
power plant in the Hudson Va
power plant in the Hudson Valley.
Mr. Percoco, who had served as Mr. Cuomo's executive deputy secretary, is accused of soliciting and taking more than $ 315,000
in bribes from 2012 to 2016 from two companies: Competitive
Power Ventures, an energy company that was seeking state approval to build a power plant in the Hudson Valley, and COR Development, a major developer in the Syracuse area that ended up with several large state - funded economic development proj
Power Ventures, an energy company that was seeking state approval to build a
power plant in the Hudson Valley, and COR Development, a major developer in the Syracuse area that ended up with several large state - funded economic development proj
power plant in the Hudson Valley, and COR Development, a major developer
in the Syracuse area that ended up with
several large state - funded economic development projects.
BUCHANAN, N.Y. — Officials say one of the Indian Point nuclear
power plant's reactors
in suburban New York has been shut down because
several control rods lost
power.
Enck also called Attorney General Eric Schneiderman a «legal firewall» for spearheading
several multi-state legal challenges to Trump, including threats to sue the President over his attempted roll - back of the Obama'administration's Clean
Power Plan aimed at controlling power plant emissions in the
Power Plan aimed at controlling
power plant emissions in the
power plant emissions
in the U.S.
A week before the Nuclear Regulatory Commission's Atomic Safety and Licensing Board begins
several weeks of hearings
in Westchester County concerning the relicensing of the Indian Point nuclear
power plants, a number of pro-Indian Point people urged the relicensing.
Despite
several attempts to secure financial assistance for the struggling FitzPatrick Nuclear
Power Plant, no funding was included for it
in New York state's next budget.
In a 2002 report, the Department of Energy laid out a plan to get rid of the nation's spent nuclear
power plants» waste, which has been piling up for
several decades.
Several workers at General Electric's
power systems
plant in Schenectady and research lab
in Niskayuna will be laid off.
In one arrangement, Bharara alleges Kelly channeled several hundred thousand dollars to Percoco and his wife in exchange for help building a power plant in upstate New York, and for other public assistance the company never received — including a guarantee the state would find a buyer for energy from the facility, and the closure of the controversial Indian Point nuclear plant in Westchester, which the governor has advocated fo
In one arrangement, Bharara alleges Kelly channeled
several hundred thousand dollars to Percoco and his wife
in exchange for help building a power plant in upstate New York, and for other public assistance the company never received — including a guarantee the state would find a buyer for energy from the facility, and the closure of the controversial Indian Point nuclear plant in Westchester, which the governor has advocated fo
in exchange for help building a
power plant in upstate New York, and for other public assistance the company never received — including a guarantee the state would find a buyer for energy from the facility, and the closure of the controversial Indian Point nuclear plant in Westchester, which the governor has advocated fo
in upstate New York, and for other public assistance the company never received — including a guarantee the state would find a buyer for energy from the facility, and the closure of the controversial Indian Point nuclear
plant in Westchester, which the governor has advocated fo
in Westchester, which the governor has advocated for.
Percoco served as the governor's executive secretary, he is accused of taking more than $ 600,000
in bribes from an energy company that needed state approval to build a
power plant in the Hudson Valley and an upstate developer that received
several state contracts, as well as getting a job at the energy company for his wife.
What is important to remember, according to Thompson, is that Kemper is just one of
several capture
power plants that are either under construction or moving to construction, that have made financing work without a carbon price
in place.
In several decades, the forests could be sustainably harvested as a source of fuel for wood - burning
power plants, making them a nearly carbon - neutral energy source, Ornstein argues.
But what is clear is that
several nuclear
power plants in the U.S. have the same safety systems that failed
in Japan.
The MATS rule was finalized
in December 2011 but has been subject to
several petitions for reconsideration from groups ranging from pollution control equipment vendors to
power plant developers.
A feature that
several of the new product designs share is that the
power plants could be mass - produced
in a factory to minimize cost, using robots to ensure consistency.
Several GOP lawmakers contacted by ClimateWire blasted the work on new targets as another example of the Obama administration's «go it alone» approach that, like the current U.S. EPA effort to rein
in emissions from coal - fired
power plants, will face fierce opposition from Congress.
If a coal - burning
power plant has
several choices
in buying coal from many nearby mines, it can easily avoid contract disputes with its nearest coal supplier by reaching out to alternative mines.
In the United States, saline aquifers are believed to have the largest capacity for CO2 storage, with potential sites spread out across the country, and several in western states such as Colorado also host large coal power plant
In the United States, saline aquifers are believed to have the largest capacity for CO2 storage, with potential sites spread out across the country, and
several in western states such as Colorado also host large coal power plant
in western states such as Colorado also host large coal
power plants.
Power plants are,
in fact, regulated under
several sections of the Clean Air Act, other observers note.
Since the early 1990s,
several research teams have found that Alzheimer's patients have lower levels of key enzymes produced
in mitochondria, tiny
power plants within cells that harbor their own genetic instructions apart from nuclear DNA.
There is no prospect that for
several years such
power reactors as described here could be licensed, for the reason that there would not be enough fissionable materials produced
in the
plants of the Authority.
In this photo dated Aug. 23, 2010, Iranian technicians work at the Bushehr nuclear
power plant, where Iran had confirmed
several personal laptops infected by Stuxnet malware.
It also holds interests
in several power plants and natural gas pipelines
in the U.S. and the Caribbean.
Brewster Shelter Agent Brian Long performed seven cat -
in - tree rescues as well as
several different types of injured wildlife from birds to foxes, a skunk caught
in a soccer net, a frightened deer
in a fenced
in tennis court and a wayward female eider unable to leave an outfall pipe canal at a
power plant in Sandwich.
He has had solo shows at
several institutions, including the Museum of Contemporary Art
in Los Angeles, Kunsthalle Wien
in Vienna, The
Power Plant in Toronto, Musée d'Art Moderne de la Ville de Paris
in Paris, MoMA PS1
in New York and Astrup Fearnley Museet
in Oslo.
A generation has passed, and
in real time, our overall architecture is still placing zero value upon the contributions to climate mitigation, for the
several power -
plants retired this year.
Realization that all coal - fired
power plants without actual carbon capture will have to be «bull - dozed»
in the next
several decades,
in all countries, should serve as an effective brake on new construction of coal - fired
power plants during the next few years
in all countries.
Our seas will need to have tens of thousands to these wind turbines deployed at
several per week to do the job
in time and only shallow offshore is viable at the present time and that is inline with existing baseload fossil fuel coal and gas fired
power plants along with existing nuclear ones to.
I worked
in several different types of
power plants for about 30 years, and there is no «good» way to generate, transmit, distribute, or store electrical energy without offending somebody, without upsetting the environment, or without following the basic laws of physics.
The presidents welcomed: (i) a grant from the U.S. Trade and Development Agency to the China
Power Engineering and Consulting Group Corporation to support a feasibility study for an integrated gasification combined cycle (I.G.C.C.) power plant in China using American technology, (ii) an agreement by Missouri - based Peabody Energy to invest and participate in GreenGen, a project of several major Chinese energy companies to develop a near - zero emissions coal - fired power plant, (iii) an agreement between G.E. and Shenhua Corporation to collaborate on the development and deployment of I.G.C.C. and other clean coal technologies; and (iv) an agreement between AES and Songzao Coal and Electric Company to use methane captured from a coal mine in Chongqing, China, to generate electricity and reduce greenhouse gas emiss
Power Engineering and Consulting Group Corporation to support a feasibility study for an integrated gasification combined cycle (I.G.C.C.)
power plant in China using American technology, (ii) an agreement by Missouri - based Peabody Energy to invest and participate in GreenGen, a project of several major Chinese energy companies to develop a near - zero emissions coal - fired power plant, (iii) an agreement between G.E. and Shenhua Corporation to collaborate on the development and deployment of I.G.C.C. and other clean coal technologies; and (iv) an agreement between AES and Songzao Coal and Electric Company to use methane captured from a coal mine in Chongqing, China, to generate electricity and reduce greenhouse gas emiss
power plant in China using American technology, (ii) an agreement by Missouri - based Peabody Energy to invest and participate
in GreenGen, a project of
several major Chinese energy companies to develop a near - zero emissions coal - fired
power plant, (iii) an agreement between G.E. and Shenhua Corporation to collaborate on the development and deployment of I.G.C.C. and other clean coal technologies; and (iv) an agreement between AES and Songzao Coal and Electric Company to use methane captured from a coal mine in Chongqing, China, to generate electricity and reduce greenhouse gas emiss
power plant, (iii) an agreement between G.E. and Shenhua Corporation to collaborate on the development and deployment of I.G.C.C. and other clean coal technologies; and (iv) an agreement between AES and Songzao Coal and Electric Company to use methane captured from a coal mine
in Chongqing, China, to generate electricity and reduce greenhouse gas emissions.
China has been building Ultra-supercritical (USC) coal - fired
power plants for the past
several years and is a leader
in USC, so the so - called important step forward merely allows China to continue to do what it has already been doing anyway.
If the PUC chooses to build the wind
power plant and there is no need for large scale CDR
in several decades, then no further investment is required.
That flexibility mandate could easily end up mirroring a state - by - state averaging approach to carbon emissions from
power plants, which was detailed
in an influential NRDC plan that appeared
in December,
several energy experts said.
Another bonus: Because algae can be grown just about anywhere
in an enclosed space, it's being tested at
several power plants across the nation as a carbon absorber.
In addition to the text of the proposed rule, EPA issued a Regulatory Impact Analysis for the Clean Power Plan, 4 along with numerous technical supporting documents and fact sheets.5 In October 2014, EPA issued a notice of data availability, which provided discussion and solicited additional comment on several topic areas, including the 2020 - 29 compliance trajectories.6 Also in October 2014, EPA issued a supplemental proposal to address carbon pollution from affected power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
In addition to the text of the proposed rule, EPA issued a Regulatory Impact Analysis for the Clean
Power Plan, 4 along with numerous technical supporting documents and fact sheets.5 In October 2014, EPA issued a notice of data availability, which provided discussion and solicited additional comment on several topic areas, including the 2020 - 29 compliance trajectories.6 Also in October 2014, EPA issued a supplemental proposal to address carbon pollution from affected power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power P
Power Plan, 4 along with numerous technical supporting documents and fact sheets.5
In October 2014, EPA issued a notice of data availability, which provided discussion and solicited additional comment on several topic areas, including the 2020 - 29 compliance trajectories.6 Also in October 2014, EPA issued a supplemental proposal to address carbon pollution from affected power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
In October 2014, EPA issued a notice of data availability, which provided discussion and solicited additional comment on
several topic areas, including the 2020 - 29 compliance trajectories.6 Also
in October 2014, EPA issued a supplemental proposal to address carbon pollution from affected power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
in October 2014, EPA issued a supplemental proposal to address carbon pollution from affected
power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power P
power plants in Indian Country and U.S. territories.7 In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
in Indian Country and U.S. territories.7
In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
In November 2014, EPA issued an additional technical support document providing examples of how a state could translate its rate - based goal into an equivalent mass - based goal, expressed
in metric tons of CO2.8 In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
in metric tons of CO2.8
In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean Power Plan
In November 2014, EPA also issued a memo addressing biogenic CO2 emissions from stationary sources that explicitly relates this topic to the implementation of the Clean
Power P
Power Plan.9
When combined with thermal storage capacity of
several hours of full - capacity generation, CSP
plants can continue to produce electricity even when clouds block the sun, or after sundown or
in early morning when
power demand steps up.
The daunting economics of gas
power in Germany, not surprisingly, has led to widespread curtailments and shutdowns across the country, including
several state - of - the art
plants unveiled
in just the past few years.
There are
several examples of good practice used
in design of coal fired
power plants.
Here,
in the United States, we need, for
several reasons, base load
power plants other than natural gas, and with the slow demise of nuclear, coal is the only alternative.
The plaintiffs
in the case, which include
several environmental groups and four western U.S. municipalities, argue that the federally supported projects — including oil drilling, pipelines, and commercial
power plants — contribute to global warming, which
in turn affects U.S. economic interests and its citizens.
For example,
in late 2004, Duke Energy, one of the country's largest utilities and most experienced builders, started planning a pair of coal - fired
power plants to replace
several built around the middle of the last century, at Cliffside,
in western North Carolina.
Several large, new solar thermal
power plants are expected to begin commercial operation by the end of 2013, more than doubling the solar thermal generating capacity
in the United States.
In the process,
several power plants were spun off as independent companies.
Now that the United States has,
in effect, a near de facto moratorium on the licensing of new coal - fired
power plants,
several environmental groups, including the Sierra Club and Greenpeace, are starting to focus on closing existing coal
plants.
He has a degree
in mining engineering
in the field of fuel and energy, from the Polytechnic University of Madrid, and his career of more than 20 years has always been closely tied to energy, managing and implementing projects
in thermal
power plants, combined cycle
plants and liquefied natural gas re-gasification
plants,
several of which as part of the SENER Group.