The mobile
shelf reading project took about a year and a half.
One of the results of our library's mobile
shelf reading project is that we ended up with thousands of lost books to review for possible replacement.
Not exact matches
While Greene's
project is an ideal way to reinvigorate one's Bible
reading (as I hope will be the case with my copy) or introduce readers to Scripture for the first time, it won't ultimately prove as effective in helping us
read Scripture theologically and spiritually, with and for the Church, as the editions you and I already have on our
shelves.
Columbine Cafeteria is the second solo exhibition that Rogers has had with the Berlin gallery, following Columbine Library in 2014, where the artist's book of poems Cunny Poems — bringing together distance and intimacy in each of its individual fragments — was
read aloud by an avatar of Rogers in a video
projected in the space, among prints and a large
shelf of stuffed toys and accessorised children's backpacks.
Process customer payments by cash, check, debit cards and credit cards Answer telephone calls from customers inquiring about merchandise in the store Process customer returns and manage exchanges Rotate merchandise, organize and restock
shelves Assist managers to reach deadlines on certain store
projects Prepare legal documents and reports for court
Read and translate reports with 99 % accuracy Data entry with 99 % accuracy Organize legal documents and put them in filing system Communicate with attorneys about discrepancies in data.
Carpenter, Harris Engineering, Tucson, AZ — 1/2004 -3 / 2009 • Installed sheetrock and plywood •
Read blueprints and drawings to ascertain scope and necessary materials for
projects • Designed, built, repaired, and installed a variety of fixtures and structures, including
shelving, windows, cabinets, and doors • Repaired and replaced roofing systems, including structural foundational layers and tile / shinglesConstruction Carpenter, First Rate Solutions LLC, Tucson, AZ — 4/2000 — 1/2004 • Prepared regular status reports to streamline knowledge and workflow between crew and customers • Completed repair and installation of
projects on time and at budget, in accordance with customer and architect specifications • Maintained inventory of all tools, materials, and supplies needed for job • Used computer - aided drafting software during design of renovation
projects • Motivated crew and subcontractors to communicate clearly and complete
projects on time