The story line is deliberately, intensely claustrophobic,
shot in the depths
of catacomb - like rehearsal
rooms and shadowy backstage corridors; it's almost unrelievedly plotted but for Paul Reiser as Andrew's well - meaning but hapless
single parent, and one forlorn girlfriend, Nicole (Melissa Benoist) left by the wayside as our hero discards her on his way to becoming «one
of the greats.»
Directed by Sam Mendes («Skyfall») with a reportedly whopping $ 300 million budget, «Spectre» opens with a magnificent sequence in Mexico City that follows Bond in a
single tracking
shot through a street - crowd
of thousands, into a top - floor hotel
room (with a woman, naturally) and onto an adjoining rooftop that becomes the setting for some spectacular property damage.
The matches are incredibly fast - paced, leaving no
room for error and, at the time
of writing this, the weapons feel unbalanced, forcing you to play with a
single -
shot rifle or as a sniper if you hope to stand a chance.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition
of the existing parking lot and construction
of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build
single story, metal framed, 47,640 square foot
of classroom building • Construct classrooms, fire lab, driving and
shooting simulator
rooms, library, offices, kitchens, multipurpose
rooms, break
rooms, and restrooms • Supervise and manage the construction
of the Gold LEED Huntington Library • Oversee demolition
of existing library in accordance with city regulations • Manage the construction
of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team
of more than 120 workers a day for refurbishment
of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation
of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use
of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation
of the Anaheim Convention Center • Remove exterior walls on 3 sides
of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use
of the convention center during ongoing construction