They can be configured as learning clusters, standalone teaching blocks and even
single classroom buildings to meet a school's precise requirements.
Not exact matches
They have forgotten that the «God of all pots and pans» (as Brother Lawrence would say) is also the God of all board rooms and assembly lines and
classrooms and office
buildings, and that a woman can bring glory to God with her life whether is married or
single, a mother or childless, a domestic champion or a woman whose talents lie elsewhere.
Thanks to every
single person standing here today who fought together tirelessly for so many years with many others, and of course Chancellor Fariña, we will once and for all get our kids out of these trailers and into real
classroom buildings.»
Just like good
classrooms are
built on reliable systems and structures, a positive faculty meeting should utilize protocols and processes that ensure all voices are heard, that no
single voice dominates, and that discussion stays focused and productive.
Demand for school places The Wykebeck and Bracken Edge school
buildings will comprise of
single storey extensions to the existing schools providing additional
classrooms to meet demand for places.
Their solution was a
single ‑ storey, low ‑ maintenance modular
building established to provide two
classrooms, a foyer and toilets for their year three pupils.
The
buildings, supplied by Portakabin, provided a series of
buildings ranging from
single classrooms hired for up to two years, to a permanent two ‑ storey brick ‑ clad
building with a lift and suspended ceilings.
Meanwhile, Birmingham City Council has approved planning permission to
build a
single - storey facility which will house a further four
classrooms.
Foremans» 10 previous projects with Surveyors to Education have included a two - storey school complex at Billingbrook School in Northampton and a
single - storey community college
building with five
classrooms and an IT hub at Winstanley College in Wigan.
Aside from the fact that schools don't offer to return money when an extra child enters this hypothetical
classroom, the ebb and flow of students in and out of every school
building everyday is subject to so many variables that it is nearly impossible to
single out one.
Such research would, in a
single effort, examine school level factors (e.g.,
building climate, home - school relations, schoolwide organization for reading, collaborative efforts) while examining
classroom / teacher factors (e.g., time spent in reading instruction, time on task, student engagement, approaches to word recognition and comprehension instruction, teachers» interactive styles).
A teacher leader program can be
built around a
single model of release time - only full - time release teacher leaders, or only part - time release teacher leaders, or only teacher leaders who have no release time from the
classroom.
Serving 318 students in grades K — 4, the 35,000 square foot,
single - story
building houses 18
classrooms, a gymnasium and a courtyard, and also incorporates some unique
building and security requirements of military bases.
The typical teacher evaluation in public education consists of a
single, fleeting
classroom visit by a principal or other
building administrator untrained in evaluation who wields a checklist of
classroom conditions and teacher behaviors that often don't focus directly on the quality of instruction.
E4E teachers that are leading this work every
single day in their
classrooms across the country hope that the Department will preserve and
build on this guidance that benefits educators and students alike.»
Whether it is a
single permanent portable
classroom that you need, or an entire temporary school
building, Mobile Modular provides a flexible and cost - effective solution for all your educational requirements.
The tweetstorm
singled out teachers like Jessica Harris, who
built Jefferson's band program «from the ground up,» and Ashley Shepherd and Britany Locher, who not only teach students ranging from a first - to eighth - grade reading level, but also «maintain a positive
classroom environment focused on rigorous content, humor, and love.
As a network of schools, we are
building career advancement opportunities to keep devoted teachers within their school while increasing their impact beyond a
single classroom.
The one
classroom building began with a
single volunteer teacher who worked full - time teaching.
The Dunk Island conference room is a custom
built centre that has the capacity to accommodate groups of up to 105 delegates (105 theatre style, 60
classroom style, 48 double u-shape, 30
single u-shape or 80 banquet).
Contractor Carpenter Tulane University — New Orleans, LA 2007 - 2012 • Performed regular carpentry and maintenance work • Completed an order of 500 wooden desks and chairs for
classrooms • Renovated campus twice a year which included polishing furniture and repair work • Carried out all kinds of carpentry work ranging from renovations to new
building construction projects • Installed cabinets, flooring, windows, doors, roof supports, etc. • Never received a
single complaint from any client
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) •
Build single story, metal framed, 47,640 square foot of
classroom building • Construct
classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory
building • Ensure compliance with Title 24 and the latest code and
building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the
building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction