Sentences with phrase «single wall construction»

Some of the homes in Kaimuki date back to the 1930's, however you'll see a mixuture of older single wall construction homes to newer stucco homes.
The single wall construction makes it a perfect choice for people looking for a great budget choice that still keeps your beer crisp and cool.

Not exact matches

Anne (Huppert), is a single mother who runs her family's business, which is met with travesty when a wall collapses on a construction site, accidentally killing an employee.
In Chelsea, Untitled (Sculptural Study, Low - Relief Wall Construction), 1975/2008, is a single thread of blue acrylic yarn that makes two perpendicular turns to include the width of the wall on its journey between floor and ceiling, while, uptown, Untitled, 1995, is a straight section of copper wire set sheer against the wWall Construction), 1975/2008, is a single thread of blue acrylic yarn that makes two perpendicular turns to include the width of the wall on its journey between floor and ceiling, while, uptown, Untitled, 1995, is a straight section of copper wire set sheer against the wwall on its journey between floor and ceiling, while, uptown, Untitled, 1995, is a straight section of copper wire set sheer against the wallwall.
An outline of the seminar content includes the history of single leaf masonry in Ireland; the importance of effective insulation; historical problems with single leaf masonry; single leaf versus cavity wall construction; advancements in single leaf masonry — ETICS; aircrete and solid masonry construction; and thin joint technology.
Thermal bridging: Single leaf Quinn Lite AAC block construction wrapped in external insulation, with Catnic thermally broken lintels, windows sat in insulation layer, Geocell foamed glass foundation system and detail extending external insulation beyond wall plate level to meet roof insulation.
With homes being turned around to world class comfort, health and energy performance standards in a twelve week build schedule, Silken Park takes a disarmingly simple approach: single leaf hollow block construction sat on an insulated foundation system, the walls wrapped in a generous layer of high density Rockwool external insulation, with a sand and cement render internally acting as the airtight layer.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constructionconstruction
Amenities: Clubhouse, Amenities: Gated Community, Amenities: Neighborhood Association, Amenities: Park, Amenities: Pool, Amenities: Underground Utilities, Basement: Slab / None, Boathouse / Dock: No Dock Or Boathouse, Construction: Stucco Unspecified, Cooling Source: Electric, Cooling Type: Ceiling Fan, Cooling Type: Central, Equipment: Alarm - Carbon Monoxide, Equipment: Alarm - Smoke / Fire, Equipment: Dryer, Equipment: Washer, Balcony, Heating Source: Gas, Heating Type: Central, Cable TV Connections, Ceilings - Trey, Ceilings 9 Ft Plus, Elevator, Handicap Access, Hardwood Floors, Recently Renovated, Tile Bath, Walk - in Closet, Wall - to - wall Carpet, Kitchen: Breakfast / Breakfast Bar, Kitchen: Breakfast / Solid Surface Counters, Kitchen Equipment: Dishwasher, Kitchen Equipment: Icemaker Line, Kitchen Equipment: Microwave - Built In, Kitchen Equipment: Range / Oven, Kitchen Equipment: Refrigerator, Laundry Location: Hall, Laundry Type: Closet, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Parking: 2 Car, Parking: Assigned Space, Parking: Drive Under / Basement, Property Type: Single Family Attached, Roof Type: Composition, Rooms: Bonus Room, Rooms: Den, Rooms: Dining Rm / Living Rm Combo, Rooms: Master On Main Level, Rooms: Other (See Remarks), Rooms: Roommate Plan, Style: Traditional, Unit Description: End Unit, Water / Sewer: Public Water, Water / Sewer: Sewer ConnecWall - to - wall Carpet, Kitchen: Breakfast / Breakfast Bar, Kitchen: Breakfast / Solid Surface Counters, Kitchen Equipment: Dishwasher, Kitchen Equipment: Icemaker Line, Kitchen Equipment: Microwave - Built In, Kitchen Equipment: Range / Oven, Kitchen Equipment: Refrigerator, Laundry Location: Hall, Laundry Type: Closet, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Parking: 2 Car, Parking: Assigned Space, Parking: Drive Under / Basement, Property Type: Single Family Attached, Roof Type: Composition, Rooms: Bonus Room, Rooms: Den, Rooms: Dining Rm / Living Rm Combo, Rooms: Master On Main Level, Rooms: Other (See Remarks), Rooms: Roommate Plan, Style: Traditional, Unit Description: End Unit, Water / Sewer: Public Water, Water / Sewer: Sewer Connecwall Carpet, Kitchen: Breakfast / Breakfast Bar, Kitchen: Breakfast / Solid Surface Counters, Kitchen Equipment: Dishwasher, Kitchen Equipment: Icemaker Line, Kitchen Equipment: Microwave - Built In, Kitchen Equipment: Range / Oven, Kitchen Equipment: Refrigerator, Laundry Location: Hall, Laundry Type: Closet, List Type: Exclusive Right To Sell, Lot Description: Level Lot, Parking: 2 Car, Parking: Assigned Space, Parking: Drive Under / Basement, Property Type: Single Family Attached, Roof Type: Composition, Rooms: Bonus Room, Rooms: Den, Rooms: Dining Rm / Living Rm Combo, Rooms: Master On Main Level, Rooms: Other (See Remarks), Rooms: Roommate Plan, Style: Traditional, Unit Description: End Unit, Water / Sewer: Public Water, Water / Sewer: Sewer Connected,
a b c d e f g h i j k l m n o p q r s t u v w x y z