Sentences with phrase «site classrooms built»

AMA Mexico catalyzed community members to plant 3,000 new trees in the park and weekly meetings focused on community development take place in the on - site classrooms built by the city of Puebla.

Not exact matches

Rauf described the center to be built two blocks from the former site of the World Trade Center towers - destroyed by terrorist - hijacked commercial jets on September 11, 2001 - as a «shared space for community activities, like a swimming pool, classrooms and a play space for children.»
Poll Everywhere is the easiest way to gather live responses in any venue... conferences, concerts, classrooms, and company off - sites — anywhere with 2007 thomas built all american vin: 1babnbka67f247651 2012 ford
Code.org is a great site for introducing programming to your classroom, and for the earliest learners (ages 3 — 7) you can try mama.codes that is built with the framework of the Scratch Jr. platform.
The nine design teams in Reeder's freshman - sophomore geometry class presented their school designs, plans, and budgets to Seattle architects Kirk Wise and Mark Miller, who were charged with selecting the project with the best concept, best use of site features, and best building and classroom design; cost was also a factor.
Build the course off - site, such as at a fundraising event, or onsite in the school gym, parking lot, multipurpose room, or classroom.
A steeply sloping site meant a traditional (masonry) construction wasn't viable and led the design team to develop proposals for a light weight timber building set on a simple raised deck, providing level access to the existing building with the opportunity for unique views from the classroom into the tree canopy.
The modular building that will be added to the school is a double modular classroom which will be clad with horizontal site - fixed cedar cladding, featuring a large decking area and a canopy clad with a green «sedum» roof.
The burnt out classrooms were replaced by mobile rooms and the school had a derelict building at its centre for over a year; this became a demolition site and then a building site.
Measures to achieve new school places might include maximising buildings or land to increase the quantum of floor space and numbers of classrooms by way of redevelopment, acquiring sites for new school premises, and / or releasing existing sites or part of sites that are no longer required, or buildings that are no longer fit for purpose.
The classrooms will run in a zigzag throughout the site, while the sports field, gym and canteen will be at the end of the building in an effort to reduce noise.
Thanks to Giroux and others, the contemporary classroom - even if it falls short of the critical pedagogues» ideal - increasingly is a block - scheduled site presided over by a teacher who, at least concerning academics, is the guide on the side, eschews grades in favor of portfolios, minimizes ability - grouping, and, rather than being a content provider, is a manager of peer editing, team building, and other processes.
For the project as a whole, we collected two rounds of survey data from principals and teachers and three rounds of site - visit data from schools and districts, including classroom observations and interviews with teachers and building and district administrators.
School - site staff consistently and intentionally implement restorative practices to build community within the classroom and school environment.
The report rates facilities in four categories: building condition; outside site conditions; learning environment, which includes air quality; and learning spaces, which focuses on adequate classroom size and space for gymnasiums, cafeterias, music, art, and other programs.
This will involve new buildings and a redevelopment of the Salisbury Road site to provide classrooms, sports and cultural facilities, and social spaces for up to 1500 students.
«To construct / renovate classrooms, restrooms / school facilities to improve the quality of education at Brittan Elementary School, build a gymnasium for school and community use; repair, construct, acquire classrooms, sites and equipment, shall this Brittan Elementary School District measure be adopted to issue $ 4,000,000 of bonds at legal rates, levy approximately 3 cents / $ 100 assessed value, generating approximately $ 260,000 annually while bonds are outstanding, with annual audits, independent citizens» oversight, NO money for salaries, all money staying local?»
As part of the project, cohort members will participate in instruction coaching and collaborative meetings with colleagues, and host and participate in site visits to build a network of informed educators to transform the traditional classroom experience.
This pilot program pairs a NAZA site with an EL teacher who facilitates guided reading and writing activities that strengthen the knowledge base students are building in their classrooms.
Similarly, the National Academy of Advanced Teacher Education, or NAATE, which provides specialized professional growth opportunities for educators, works to retain teachers and school leaders through opportunities to grow in data - driven instruction techniques, peer leadership, and communication and feedback.32 Building on past professional learning successes via its network of teacher leaders in 185 sites, the National Writing Project's, or NWP's, College Ready Writers Program demonstrated that teachers will commit to and participate in high quality professional development that helps them strategize approaches to teach argument writing using nonfiction texts and provided adaptable classroom materials.
Not only do our facilities boast state on the art boats and equipment, purpose built infinity training pool, private Air Conditioned classroom just for Instructor Candidates with a full reference library but all this is set on a white sand beach, facing sunset, with a gorgeous bar and restaurant and accommodation for all budgets right here on site.
All courses are conducted in the centre's air conditioned classrooms with the in - water training modules taking place in the purpose built on - site training pool.
Train in tropical paradise in Kona, Hawaii with our friendly and knowledgeable professional staff at Jack's Diving Locker — a PADI 5 Star IDC Dive Resort with ample classroom space, custom - built scuba training pool, and premier open water training sites.
has its own on - site purpose - built pool and state - of - the - art classroom, as well as two fully equipped dive boats so you can learn the ropes, no matter what your skill level.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z