The fast, challenging and highly technical 3.4 mile circuit became even faster and more precise in 2016 following a full repaving which produced
a smooth track surface and resulted in lap times two to three seconds per lap quicker than the previous years.
I would characterize the old circuit as high - speed and bumpy, but with the new pavement, we anticipate
a smoother track surface.»
Not exact matches
The
track will undergo a repave with the coarse asphalt being replaced by a
smooth, slick
surface with no shortage of grip, which will bring with it high speeds that are expected to exceed 200 mph entering Turn 1 and likely less compelling racing.
«Based on detailed measurement, we will renew the
track surface in the Flugplatz section over a length of about 500 metres,
smoothing out five bumps which are the result of years of high utilisation and heavy use of the Nordschleife,» Carsten Schumacher, the managing director of the Nurbugring explained.
On the
track, as you can read below, the Twingo claws back some ground again, the Cup chassis at home on the
smooth surface and the handling marginally more entertaining with its more incisive turn - in and edgier feel.
Away from the autopian, glassy
smooth surfaces of the
track, the suspension transmits every joint, kink, and crevice in the pavement, conveying a bas relief map of the road directly through the thin carbon racing buckets.
Track — Transmission shift times are reduced 68 percent versus Auto Mode to 160 milliseconds; stability control, four - wheel drive and steering systems are set for ultimate track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on smooth, dry surfaces; uses 30/70 torque
Track — Transmission shift times are reduced 68 percent versus Auto Mode to 160 milliseconds; stability control, four - wheel drive and steering systems are set for ultimate
track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on smooth, dry surfaces; uses 30/70 torque
track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on
smooth, dry
surfaces; uses 30/70 torque split
A couple of flat - out laps around Honda's Tochigi test
track reveal enough acceleration to keep the traction control light permanently on through first and second on a
smooth dry
surface.
Track — Transmission shift times are reduced 68 percent versus Auto Mode to 160 milliseconds; stability control, four - wheel - drive and steering systems are set for ultimate track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on smooth, dry surfaces; uses 30/70 torque
Track — Transmission shift times are reduced 68 percent versus Auto Mode to 160 milliseconds; stability control, four - wheel - drive and steering systems are set for ultimate
track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on smooth, dry surfaces; uses 30/70 torque
track performance; paddle shifters are enabled and suspension is set to full firm to deliver maximum vehicle performance capability on
smooth, dry
surfaces; uses 30/70 torque split
The
track surface in Le Mans is very
smooth, while Lime Rock's
surface is rather irregular.
Whereas normal race cars compete on
smooth, even race
track surfaces, a rally stage consists of dips, large rocks and jumps.
The hard suspension setting is best left for race
tracks where the road
surface is very
smooth.
Custom — Allows the driver to personalize the vehicle's performance Sport — Delivers increased vehicle performance capability over the Default Mode
Track — Delivers maximum vehicle performance capability on
smooth, dry
surfaces Default — Activates automatically when starting the vehicle Eco — Maximizes fuel economy with a revised shift schedule, pedal map and second - gear starts
The
smooth transitions between
surfaces exude a certain sensuousness, while the heavy tapering of the car's shoulders combines with a wide
track to bring extra definition and athleticism.
We tried the car on a dusty off - road
track, where its ability to climb loose gravel on a sharp incline impressed us, as well as its
smooth descents on similar
surfaces.
And you're not limited to riding linear
tracks — there are a few levels that have the cart rolling around on circular
surfaces, but in a really clever and
smooth way.
We couldn't help but walk the
track with our camera to get a good feel of the
surface and turns which were usually either surprisingly bumpy or
smooth depending on
surface type.
One thing which I forgot to mention is how the motion base also responds to different
surfaces and events — you'll definitely notice this a lot on the Canyon
track, as you transition from bumpy gravel to
smooth tarmac.
Running on the PC, we see a
smooth 60 fps with vastly improved lighting, as the circuit lights reflect on the
track surface, as do the illuminated buildings.
Another issue I found with WMR on the
Surface Book 2 came in the form of motion controller
tracking, which again doesn't feel completely
smooth.
The ZenBook's 4.0 x 2.8 - inch touchpad is a
smooth, cool
surface that offers accurate
tracking.
•
Track record of efficiently preparing worksites by removing hazardous materials and debris • Proven ability to fashion track lengths according to set standards and specifications • Hands - on experience in inspecting tracks to determine need for repair and maintenance • Familiar with replace, remove and repair tracks and related components to ensure smooth railroad operations • Effectively able to handle drilling duties to insert bolts and joints and perform preventative maintenance on tracks and components • Highly skilled in gauging deviations in track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bea
Track record of efficiently preparing worksites by removing hazardous materials and debris • Proven ability to fashion
track lengths according to set standards and specifications • Hands - on experience in inspecting tracks to determine need for repair and maintenance • Familiar with replace, remove and repair tracks and related components to ensure smooth railroad operations • Effectively able to handle drilling duties to insert bolts and joints and perform preventative maintenance on tracks and components • Highly skilled in gauging deviations in track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bea
track lengths according to set standards and specifications • Hands - on experience in inspecting
tracks to determine need for repair and maintenance • Familiar with replace, remove and repair
tracks and related components to ensure
smooth railroad operations • Effectively able to handle drilling duties to insert bolts and joints and perform preventative maintenance on
tracks and components • Highly skilled in gauging deviations in
track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bea
track surfaces and performing related repair work to ensure train safety • Exceptionally well - versed in operating picks, shovels, bulldozers and spike - driving machines to meet rail
track repair, maintenance and installation needs • Deep insight into inspecting tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bea
track repair, maintenance and installation needs • Deep insight into inspecting
tracks for defects and reporting and clearing potential obstacles, especially after bad weather • First - hand experience in performing lookout and hand signaling duties during
track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for tracks, cutting tracks to lengths and installing railway switches • Qualified to remove damaged rail track parts and examine and maintain switch lamps and wheel bea
track operations such as installation and maintenance • Competent in laying and fixing foundations and sleepers for
tracks, cutting
tracks to lengths and installing railway switches • Qualified to remove damaged rail
track parts and examine and maintain switch lamps and wheel bea
track parts and examine and maintain switch lamps and wheel bearings
The 6» Hi - Density Foam Mini Roller With Round Ends Eliminates
Track Lines And Gives A Spray Like Finish To
Smooth Surfaces
The 6» Hi - density foam mini roller with round ends eliminates
track lines and gives a spray like finish to
smooth surfaces.