Sentences with phrase «software changes to test»

Not exact matches

Extensive revisions to their software won't be necessary, but any changes must go through a testing protocol before going live, so we shouldn't expect to be able to file returns claiming these items right away.
Unlike software, you can't AB test your pricing and change it for different customers, which means your product has one price and everyone wants to know what it is.
If the developers want to test the effects of a change, they can run the software and see what happens, as many times as necessary.
«With our flight software, the SLS program at Marshall partnered with NASA's Engineering and Safety Center, Armstrong Flight Research Center at Edwards, Calif., and the Space Technology Mission Directorate's Game Changing Development Program to test our algorithm on a NASA F / A -18 airplane,» added VanZwieten.
In addition, you can use the software to view self - diagnostic test reports and send email / text notifications for lockdown status changes and self - diagnostic results
Because the test vehicle was manufactured before the software change, the airbag computer was reprogrammed by a Fiat Chrysler engineer before the test to perform in the same manner as later production vehicles.
That could change soon, though, as Motorola has apparently been trialling an over-the-air Jelly Bean upgrade with Xoom Wi - Fi owners who previously signed up to test the software.
MG Siegler, the TechCrunch writer has revealed out these details after having spend an hour with this tablet, which is a Design Verification Testing unit running on a version «prior to Android 2.2 Froyo» and its software needs to get some changes and tweaks before the launch time.
The enterprise must document, control, test and retain every change to requirements, specifications, process (including software and algorithms) and data definition including metadata.
Law firms will need to learn to identify client needs, run change programmes, manage projects, develop and test client facing software, run proof of concepts, develop new pricing and support models and bring new solutions to market.
During the testing phase there will inevitably be adjustments — modifications to the filter lists, changes in document collection or tagging procedures and revisions to the user interface of the software.
The ATJ Tech Fellow will review and test Upsolve's automated document assembly tool in order to develop prioritized recommendations for changes and updates; conduct user interviews and user testing in order to identify how Upsolve can better assist legal aid / pro bono attorneys do their jobs more efficiently and effectively; and develop and implement tests to measure the usability and utility of the software for low - income users.
If you'd like to put off feature updates and changes until most testing is done — potentially to test those updates yourself if you're part of an organization with mission - critical software — then enable the «Defer upgrades» option.
The applications for your phone haven't changed much over the years and you can download and install the software to test out for free.
That's because, like every beta / testing build that Huawei releases internally, the software version is changed to mitigate leaks.
The vast number of certification tests can vary from country to country, different supply chains and retailers also need to be coordinated with, and there are even subtle changes in the software (such as language patterns) that one may need to account for.
Among the changes this software update brings is HD wallets, API and SDK testing, integration partner testing and an testnet Alpha release of Evolution to their partners.
When it comes to the software, we find the same Timescape UI we know from previous iterations, with small changes to the tried and tested formula.
This is also on pre-release software (We did get an OTA last night, but it's hard to test out an OTA overnight for a review), and things are likely to change after this review is published.
Microsoft doesn't like to talk about the inner workings of its anti-piracy software, but it's clear from testing that Windows 10 included a major change in the way activation works.
From our brief testing period, it seems Sony has done little to change the software experience from the Xperia Z2, which is probably for the best.
Responsible for testing software and programs and informing the changes required to developers
Handle tasks of identifying and testing changes to the process by using sophisticated modeling software
Served on User Acceptance Team providing support software testing, proving to reduce or eliminate change request and drastically reduce project cost.
• Identify clients» requirements by conferring with them and providing them with an overview of possibilities • Draw electrical project specifications and provide clients with information on how a project will be implemented • Work according to project specifications and technical drawings and manage any redesigning needs as the project proceeds • Create models and prototypes using 3D design software • Propose modifications on existing and pipeline projects • Make - certain that the final product qualifies quality standards • Test run each module of each electrical project and make necessary changes • Prepare project documentation for each module • Write reports at the completion of testing and prepare corresponding presentations • Monitor existing products to determine design improvements for later ones
Once the software is installed, software engineers are required to test it for proper functionality, and at the slightest hint of a problem they perform troubleshooting activities or make changes in the source code.
Provided weekly updates to team on release calendar, managing software deployments, testing, change freezes
• Bachelor of Science in Computer Science or Information Systems • Knowledge of Java and database design with the ability to continuously learn new technologies • Windows system, Linux, and software testing experience with the ability to clearly document results • Excellent English communication skills, both written and verbal with individuals and groups • Ability to actively prioritize work tasks in order to meet deadlines in a frequently changing environment
Documented issues and questions encountered during customer software testing or production usage in the applicable repository, such as CST or CRM, including the desired changes to the software to meet the business need
Professional Experience Vision Appraisal Technology (Northborough, MA) 03/2004 — Present Information Technology Analyst -LRB-[Insert Dates in Role]-RRB- • Provide network, desktop, printer, hardware, software, printing, peripherals devices, and application support to front - end users within a data center environment, assisting remote users with network / VPN connectivity issues • Execute various active directory tasks including both adding and deleting users and groups as well as setting up shared areas for controlled data access • Verify the successful back - up of servers as well as the deployment of anti-viral applications and system updates • Perform Oracle DBA tasks, including software installations, patching, backups, and upgrades, while creating Oracle production and cloning environments for testing and software development • Aid in the upgrade, migration, and management of servers, while participating heavily in any infrastructure changes • Maintain hardware asset control inventory as well as provide FTP, website, and intranet administration • Create standard desktop images to decrease software application re-installation time and develop documentation for both installation and back - up procedures • Deploy new desktop and laptop devices to end - users with enterprise applications accommodating specific user job functions
General Electric (Stamford, CT) 2007 — 2008 Corporate Consultant — Infrastructure Systems & Network • Designed, developed, and engineered GE Treasury system's development, QA, Production, and DR environment • Hardware: Sun Fire V220, V480, V880, V1290, V6140, V6800, V6920; Sun Enterprise T2000, T5120 (Solaris 10: LDOMS, ZFS, RAID, Zoans, Containers), E10K, E15K, E25, M4000, M8000, M9000; HP ProLiant with Linux 5.0 (EMC and 3 PAR SAN) • Built servers from racking, cabling (Ethernet / fiber), connecting to network, setting serial connection to Avocent ports, and setting up server to the network through DNS • Performed massive installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 6000 servers • Installed and configured Solaris 10 OS, recommended patches, hardening software, LDOMS, ZFS, and Container on Sun server • Installed and configured Emulex LPFC, EMC Power path, Navisphere, Veritas Volume Manager, Veritas Cluster Server, Veritas Volume Replicator, and Veritas Net Backup in heterogeneous environment • Partitioned and mirrored disks using Solaris LVM, disk suites, Veritas VxVM, mirrored root file system and set up alternate boot device and dump device • Installed application software for ITG, IDM, and Tibco etc. • Created and adjusted Oracle projects on oracle 9i and 10g • Configured operating systems, LDOMS, ZFS, RAID, network Multi Pathing, Cisco Switch 6309, Brocade Switch, EMC DS41000 fiber switch, EMC, 3 PAR and HITACHI SAN, DNS, NIS, NIS plus, LDAP • Created LUNs for EMC, 3 PAR, HITACHI SAN and set up RAIDS • Created zoning of Cisco 6309 switch • Provided connectivity of Ethernet ports and fiber channel by patching Ethernet ports from server panel to switch, and by patching fiber from server to Brocade switch then to EMC DS41000 switch through Cisco switch6300, 6309, Big IP • Performed alternate boot testing, crush dump testing and cluster testing • Vendor liaison for Cisco, HP, IBM, EMC, Symantec, Oracle Sun, and Red hat Linux resolving hardware and software issues • Scheduled changes and upgrades communicating with business owners and support team • Architected Disaster Recovery System conducted testing and resetting the systems as needed • Performed zoning and provisioning configured EMC / Power path LUNs on UNIX servers upon client's request • Resolved issues with NIS, NIS +, DNS, VxVM and VCS among other SA tasks • Created network topology of the internet and intranet security environment using Visio 7.5
a b c d e f g h i j k l m n o p q r s t u v w x y z