Sentences with phrase «space frame construction»

The body is space frame construction, meaning the skeleton of the car provides the rigidity and crash protection rather than the body panels as in unibody construction.
Features: Audi Magnetic Ride Stsyem featuring ferromagnetic dampers, Audi Aluminium Space Frame construction, R - Tronic automated 6 - speed manual with Launch Control, Quattro all wheel drive.

Not exact matches

Whitehead's endeavors to resolve questions of becoming began with physical nature as a frame of reference and an event as the primary datum in the construction, functioning, and form of nature, with the time factor of space - time constituting one of the major expressions of the relation between events.
Since I knew nothing about construction, I was unaware that the 2 × 4 framing studs for the ceiling needed to be spaced to match the 48 - inch sheets of plywood.
These should include: free access to outdoor play space; equipment for physical play (eg football, climbing frame, skipping ropes, ball games, etc); a range of indoor activities such as board games, construction toys (eg Lego, K'Nex), role play (e.g dressing up), toy cars, dolls, dinosaurs; computer games / Wii; and art and craft materials.
Built on Audi's lightweight aluminium space frame, the R8 Spyder V10 Plus benefits from the construction techniques used in the regular R8 Spyder, which means a combination of aluminium and carbonfibre at its core and the stiffest possible chassis.
Although built on the VW Group's ubiquitous MQB platform, it retains the Audi Space Frame aluminium and steel hybrid construction of the previous models and, as you would expect, is lighter, more efficient and faster than before.
That means it's essentially hand - built at the brand's Böllinger Höfe facility using plenty of aluminium and carbonfibre reinforced plastics in its strong and relatively light Audi Space Frame (ASF) construction.
Overview: Body Style: 2 - door coupe Accommodations: 2 passengers Construction: Aluminum «Audi space frame» unibody
Key to its construction is its multimaterial space frame, a combination of aluminum, carbon fiber - reinforced polymer (CFRP), and glass fiber - reinforced polymer (GFRP).
Chassis: Audi Space Frame (ASF) in aluminium - CFC hybrid construction with stressed steel roll - cage, bodywork parts from CFC and aluminium
The benefit of the unibody construction (compared to traditional body on frame construction) is better space utilization and vehicle packaging, better handling, and enhanced energy absorption capabilities.
What is more significant, is the 612» sall - aluminum space frame and body - panel construction — the first for a V12 Ferrari.
On a historical note, the Trans Sport and friends also introduced such features as space - frame construction and power - sliding side doors to the segment.
The new Audi Space Frame combines several materials like aluminum and CFRP to enable a lightweight construction of 1,555 kg (3,428 lbs) for the R8 and 1,454 kg (3,205 lbs) for the R8 V10 Plus which makes the new model up to 50 kg (110 lbs) lighter than its predecessor.
[7] The fundamental construction of the R8 is based on the Audi Space Frame, [2] and uses an aluminium monocoque which is built using space frame princiSpace Frame, [2] and uses an aluminium monocoque which is built using space frame princiFrame, [2] and uses an aluminium monocoque which is built using space frame princispace frame princiframe principles.
Advanced Audi magnetic ride This classic configuration, combined with advanced Audi Space Frame (ASF) construction mating lightweight aluminium panelling to an aluminium space frame, provides the very best operating conditions for the futuristic chassis with its agile double wishbone set - up and standard Audi magnetic ride adaptive damping sySpace Frame (ASF) construction mating lightweight aluminium panelling to an aluminium space frame, provides the very best operating conditions for the futuristic chassis with its agile double wishbone set - up and standard Audi magnetic ride adaptive damping syFrame (ASF) construction mating lightweight aluminium panelling to an aluminium space frame, provides the very best operating conditions for the futuristic chassis with its agile double wishbone set - up and standard Audi magnetic ride adaptive damping syspace frame, provides the very best operating conditions for the futuristic chassis with its agile double wishbone set - up and standard Audi magnetic ride adaptive damping syframe, provides the very best operating conditions for the futuristic chassis with its agile double wishbone set - up and standard Audi magnetic ride adaptive damping system.
* Second R8 model powered by 5.2 - litre V10 FSI petrol engine scheduled to open for UK order in January 2009 for first deliveries next spring * Available with manual gearbox at # 99,575 OTR, or with R tronic sequential shift transmission at # 104,665 OTR (R8 4.2 V8 # 77,405 OTR and # 82,495 OTR) * 5,204 cc V10 produces 525PS at 8,000 rpm and 530Nm at 6,500 rpm (R8 4.2 V8 420PS at 7,800 rpm, 430Nm at 4,500 rpm) * 0 - 100kmh in 3.9 seconds, top speed 313kmh, combined mpg 20.6 (R8 4.2 V8 R tronic 0 - 100kmh in 4.6 seconds, top speed 299kmh, combined mpg 20.7) * Combines classic mid-engine configuration with advanced all - aluminium Audi Space Frame (ASF) construction and quattro permanent four - wheel - drive * World's first all - LED headlamps as standard, plus Audi magnetic ride adaptive damping and Bang & Olufsen audio system
Exceptionally high - quality and precise space - frame construction is accomplished via this innovative methodology which combines highly precise robotic control of the weld process with the advanced skills of PMC weld technicians.
Material Audi space frame (ASF): Lightweight construction concept which is a mixed construction using aluminium and steel
Hagen emphasises this difference in level by making a self - supporting construction in metal space frames — structures formed by interlocking struts — that forms an L - shape, jutting out from the first - floor space and meeting the wall of the lower main space at an angle.
Many of the exhibited pieces display a relationship with the concept of windows which in the work of the Portuguese artist is amplified, not merely by the Renaissance structure of the frame / window itself — a technique ready to open new abstract perspectives on the concept of space — but in that particular use of materials tied to the construction of a window.
Thomas in her photograph of an image of a window, Moments of Place IV, explores the depth and construction of space within the picture frame while masterfully considering color and form and, in depicting an architectural detail and through the work's placement in the gallery, draws attention to spacial relationships.
Namely, the works were usually guided by the construction of pictorial space using expressive brush marks and lush colors, almost always painted on the backs of old picture frames.
The installation props by Julian Irlinger consists of lenticular prints installed on the uncladded frame of a drywall construction positioned diagonally to the exhibition space.
Starting on September 1st, the San Francisco Museum of Modern Art (SFMOMA) will be presenting an exhibition that «bends and blurs the boundaries between conceptual art and theoretical architecture, using the notion of the «field» to frame an investigation into the construction, representation, and experience of space
The impact of these interactions on her art is readily apparent in her «painting constructions» such as Sphinx (1962), a chaotic diorama, which preserves the rectangular space of the frame and its presentation hanging on a wall but expands into space, providing a capsule in which to assemble objects from everyday life, linked and layered together with string and smears of paint.
This construction uses 2» XPS rigid insulation against the concrete foundation and a 2x4 framed wall with R - 13 unfaced fiberglass insulation in the stud space.
This construction uses 2 layers of 2» foil - faced polyisocynaurate insulation against the concrete foundation and a 2x6 framed wall with R - 19 unfaced fiberglass insulation in the stud space.
Carpenter / Framer, Reliant Construction, Santa Fe, NM — 3/2004 -2 / 2011 • Refinished and renovated flooring, cabinets, furniture, and decks • Built custom decks and patios to customer specifications • Remodeled bathrooms, laundry rooms, and kitchens • Framed new homes and additions onto existing homes for a variety of commercial and private customers • Advised customers on flooring and lumber options for new construction and remodeling • Built custom structures for businesses in the entertainment industry, including stages, bars, and sound booths • Designed and built custom walk - in cooler for specialty beer pub, covering every aspect of construction, from framing into unfinished basement space to finishing with fiberglass reinforced plastic • Repaired roof damage, including eaves, trusses, fascia, shingles, and tile roofiConstruction, Santa Fe, NM — 3/2004 -2 / 2011 • Refinished and renovated flooring, cabinets, furniture, and decks • Built custom decks and patios to customer specifications • Remodeled bathrooms, laundry rooms, and kitchens • Framed new homes and additions onto existing homes for a variety of commercial and private customers • Advised customers on flooring and lumber options for new construction and remodeling • Built custom structures for businesses in the entertainment industry, including stages, bars, and sound booths • Designed and built custom walk - in cooler for specialty beer pub, covering every aspect of construction, from framing into unfinished basement space to finishing with fiberglass reinforced plastic • Repaired roof damage, including eaves, trusses, fascia, shingles, and tile rooficonstruction and remodeling • Built custom structures for businesses in the entertainment industry, including stages, bars, and sound booths • Designed and built custom walk - in cooler for specialty beer pub, covering every aspect of construction, from framing into unfinished basement space to finishing with fiberglass reinforced plastic • Repaired roof damage, including eaves, trusses, fascia, shingles, and tile rooficonstruction, from framing into unfinished basement space to finishing with fiberglass reinforced plastic • Repaired roof damage, including eaves, trusses, fascia, shingles, and tile roofing materials
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing constructionconstruction
Class: Single Family Attached, Sale: For Sale, Property Type: Single Family Attached, Amenities: Gated Community, Amenities: Neighborhood Association, Amenities: Pool, Attached Type: Built As Condo, Cooling Source: Electric, Basement: None, Cooling Type: Central, Boathouse: No Dock Or Boathouse, Heating Source: Electric, Energy Related: Thermo, Energy Related: Programmable Thermostat, Amenities: Physical Fit Facilities, Interior: Ceilings 9 Ft Plus, Interior: Hardwood Floors, ComplexAccess: Gated, Energy Related: Water Heater - gas, Kitchen Equipment: Dishwasher, Kitchen Equipment: Oven, Interior: Cable In Street, Interior: Carpet, Kitchen Equipment: Refrigerator, Water: Sewer In Street, Lot Description: None, Parking: 1 Car, Interior: Walk - in Closet, Laundry Type: Room, Stories: 1 Story, Rooms: Living Rm Combo, Rooms: Master On Main Level, Parking: Assigned Space, Rooms: Family Room, Water: Public Water, Roof Type: Composition, Water: Sewer Connected, Unit Description: End Unit, Style: Traditional, Construction Status: Resale, Water Description: Utility Company Control, Amenities: Walk To Shopping, Construction: Frame, Ownership: Condominium, Heating Type: Forced Air, Kitchen: Breakfast Bar, Amenities: Walk To Marta, Style: Mid Rise, Interior: Elevator
Class: Residential, Land Size: Standard Lot 6000 - 9999 SF, Sale: For Sale, Status Category: Active, CONSTRUCTION: Frame, LAND USE: Single, SEWER: Yes Connected, TERMS: Cash, TERMS: Conventional, WATER: City Service, Setup: $, Eating Space Level: Main, Association Freqency: Not Applicable, Irrigation District (Y: Yes, Internet Address Display: Yes, Display Comments: Yes, Internet Include: Yes, INCLUDED KITCHEN FEATURES: Range Freestanding, Family Room Level: Main, CONSTRUCTION: Metal Siding, INCLUDED KITCHEN FEATURES: Tile Counters, Master Bedroom Level: Main, Bedroom 2 Level: Main, Level: Single with Below Grade, FIREPLACE: Wood Stove, Bedroom 4 Level: Down, Home Owner Exempt (Y: Yes, School District: Boise School District # 1, Assigned Sr High: Boise, FIPS Code: 16001, Bedroom 3 Level: Down, Assigned Jr High: North Jr, Assigned Grade School: Lowell, Subdivision: Cruzen, Living Room Level: Down, Status: New, ROOF: Composition Shingle, GARAGE TYPE: RV, STRUCTURE FEATURES: Bed - Master Main Level, STRUCTURE FEATURES: Satellite TV, COOLING: Central Air, STRUCTURE FEATURES: Bath - Master, STRUCTURE FEATURES: Family Room, STRUCTURE FEATURES: Dual Vanities, STRUCTURE FEATURES: Bonus, LOT FEATURES: Fenced Part, STRUCTURE FEATURES: Hardwood, LOT FEATURES: R.V. Parking, STRUCTURE FEATURES: Renovated, STRUCTURE FEATURES: Carpet, STRUCTURE FEATURES: Laminate Flooring, Mineral Rights (Y: Unknown, WATER HEATER: Electric
Clearly it has been many years since we heard the term: solid brick construction, as in air space between the framing and the actual bricks.
Additional Fee Incl \ Lease Prep Fee, Central Air Conditioning, Construction \ Frame, Cooling System: electric, Electric Air Conditioning, Elementary School: Manatee, Exterior Type: Stucco, Flooring: Carpet, Flooring: Tile, Front Door Faces \ E, Furnishings \ None, General County Loc \ Central, Heating system: Central, Heating: Electric, High School: Viera, Interior Features \ Ceiling Fan (s), Interior Features \ Closet - Walk - Ins, Interior Features \ Open Floor Plan, Interior Features \ Window Treatments, Lease Terms \ 1 Yr Minimum, Legal / Misc: Pets \ Owner Will Consider, Legal \ Misc: Pets \ Owner Will Consider, Lot Description \ Sidewalks, MLS Listing ID: 797128, MLS Name: Space Coast Broker 156 - RE / MAX Absolute Service Team (Space Coast Broker 156 - RE / MAX Absolute Service Team), Measurements From \ Tax Rolls, Middle School: Kennedy, Pet Restrictions \ Other - Call Agent, Pool - Community \ Yes, Pool - Private or Community \ Yes, Possession \ Subject to Lease, Roof Type: Asphalt, Schools: Elementary School \ Manatee, Schools: High School \ Viera, Schools: Middle School \ Kennedy, Split Bedroom \ Yes, State / Province \ FL, State \ Province \ FL, Status \ Active, Style \ 5 + Units, Subdivision / Condo Nm \ LAKES AT VIERA EAST CONDO, Subdivision \ Condo Nm \ LAKES AT VIERA EAST CONDO, Utilities \ City Water Available, Utilities \ Electric, Water included in rent
Investors have increased their spending here by 50 percent in that time frame, with more than $ 958 million in office sales transactions this year, including the $ 372.5 million sale of US Bancorp Tower to TPF Equity REIT at a price of $ 338 per sq. ft. Almost 50 percent of the 1.5 million sq. ft. under construction is pre-leased, and tenants looking for large blocks of space are being forced to wait until next year.
a b c d e f g h i j k l m n o p q r s t u v w x y z