A fantastical image clothes the hoardings surrounding Peckham
Space during its construction and when the building is complete in summer 2010 it will -LSB-...]
For those that follow me on Instagram @SummerAdamsDesigns, I've shared many views of
this space during the construction process and I've shared the beautiful view outside these windows.
Not exact matches
During my visit, Davis takes me to a client's new home in Bedford Park, where one of her employees, Angela, is overseeing
construction of a new storage
space.
Often
during the
construction of new Shacks, particularly those in new markets, we reimagine the often uninspiring plywood walls that surround a
construction site and use this
space as a canvas to begin the process of integrating the Shake Shack brand into the community prior to it even opening.
• Inclusion of new 63 row single - tier stand responds to Club desire to create the most atmospheric stadium in Europe • Planning application lodged with Haringey Council for a world - class stadium, public square, hotel, supermarket, homes and
space for the Tottenham Hotspur Foundation • Delivered on the current site and adjacent land, ending concerns about a move out of the Borough with no need for even a temporary move
during construction • Major investment into North Tottenham to provide a huge boost to the area • A flagship for the wider regeneration of the area
• modern design, solid wood mini-crib sized for urban living
spaces • bassinet with extended use as mini-crib, comfortably up to 12 months (longer usage dependant upon baby's size) • sized for room - to - room mobility
during nap time; fits easily through small & standard doorways • patented no - tools - required easy set up in under 5 minutes • compact-fold
construction for easy storage & transport (durable storage bag available) • open slats on all four sides maximize all important air - flow • 2 position adjustable mattress platform for growing baby • 4 lockable castors • ** colour may vary per country
Quite rapidly, this
space was set up and in use - even
during construction time.
Meanwhile, the library
construction already under way on part of the closed lot means that
during September, commuters will compete for the 150 remaining
spaces there.
During construction, pupils then worked alongside teachers, parents, the local community and the SWA team to fill its
spaces.
During her time as Superintendent of Paloma, she started a grant - funded preschool, won two blended learning grants, increased school enrollment, student achievement, developed community
space on campus, and has started
construction of a new school.
The school's facilities committee and administration had already agreed on a request for Cohen students to remain in their building
during construction of the building in the site's green
space, and the board discussed that recommendation further on Monday as well.
Designed as a lifestyle hotel brand, all Cambria Suites properties are new -
construction and feature a larger lobby to give guests a more social atmosphere; all - suite rooms that are larger than standard hotel rooms and include separate living, working and sleeping
space; and the latest MediaHub technology that allows hassle - free Internet connectivity for a variety of electronic devices
during their stay.
«A pioneering figure in what is often referred to as the Light and
Space movement in Los Angeles during the 1960s and 1970s, Doug Wheeler is noted for his innovative constructions and installations that manipulate the perception and experience of space, volume, and l
Space movement in Los Angeles
during the 1960s and 1970s, Doug Wheeler is noted for his innovative
constructions and installations that manipulate the perception and experience of
space, volume, and l
space, volume, and light.
Her first works, made
during the 1980s, were
constructions or spatial extensions of existing architecture such as Gallery inexistent, Antwerpen (1988), an installation created by stacking borrowed concrete blocks in a gallery
space.
Rose's son Jonathan Rose, whose firm served as Cooper Union's owner's representatives
during construction, spoke poignantly about the meaning of naming this special
space for his late father.
Recent and current exhibitions include The Time Domain, a site specific live work, presented
during Liverpool Biennal 2016, co-commissioned between Bluecoat School and Liverpool Biennial; 2015: I reached inside myself through time, commissioned for LIAF, Lofoten International Art Festival, Norway, 2014: PROTOTYPES, Limerick City Gallery of Art, Limerick; A Leisure Complex, Collective, Edinburgh; 2013: INTERZONE, The Box, The Wexner Center, Columbus, Ohio; The Face of Something New, Scriptings, Berlin; A Stew of Universals, ZKU, Berlin; 2012: PRECAST, off - site project, London; INTERZONE, Seamus Ennis Center, Fingal, Co Dublin, 2011: The Eyes of Ayn Rand, Performa 11, New York; Another
Construction, Irish Museum of Modern Art, Dublin;
Space replaced by volume, Granoff Centre for the Arts, Brown University, Providence, Rhode Island.
With the Modern closing its Midtown home on May 21
during construction work and decamping to Long Island City, Queens, where it opens temporary exhibition
space on June 29, the museum will have time to organize an exhibition that will include the gift, along with 24 additional works on loan from UBS PaineWebber.
With the «Polish Village» series — including Bechhofen (1972) and its maze of painted forms — collage and large - scale
constructions made literal the «bubble
space» he identified in Caravaggio, Mondrian, Pollock and others
during the Harvard lectures.
With the museum closing its home on 53rd Street on May 21
during construction work and decamping to Long Island City, Queens, where it will open temporary exhibition
space June 29, it will have time to organize an exhibition that will include the gift, along with 24 additional works on loan from UBS PaineWebber.
A pioneering figure in what is often referred to as the Light and
Space movement in Los Angeles during the 1960s and 1970s, Wheeler is noted for his innovative constructions and installations that manipulate the perception and experience of space, volume, and l
Space movement in Los Angeles
during the 1960s and 1970s, Wheeler is noted for his innovative
constructions and installations that manipulate the perception and experience of
space, volume, and l
space, volume, and light.
Case Work: Studies in Form,
Space &
Construction by Brad Cloepfil / Allied Works Architecture is the first comprehensive exhibition to explore artworks created
during the firm's investigative process, which is at the heart of its practice.
For instance, the Secure Enclave itself is generated
during the phone's
construction with a unique ID (UID) unknown both to Apple and other parts of the software stack; that is mixed with an ephemeral key created when the iPhone boots, and the result used to encrypt the memory used for the locked - down
space.
Professional Experience SMC
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and
construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of new 458 parking
spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing
construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center
during ongoing
constructionconstruction
Suburban office Demand for suburban office
space has kept pace with the spec
construction cycle, which
during the second quarter included the opening of eight new office buildings.
In 1999 alone, CBL plans to open 2 million sq. ft. of new
space and start
construction on another 1 million sq. ft.. That's an ambitious plan considering the REIT industry's dismal ride on Wall Street
during the past year.
Miscellaneous retail projects — those that include non-anchor, non-branded
space ranging from car dealerships to convenience stores represent the largest chunk of activity
during first quarter with 25.7 million sq. ft. or 31 percent of all
construction starts, according to PPR and McGraw - Hill Construct
construction starts, according to PPR and McGraw - Hill
ConstructionConstruction - Dodge.
The results include office
space completed
during the course of the year or under
construction as of Dec. 31, 2012.
During negotiations, Suntide also works with the
space planner to finalize design and confirm
construction costs.
During a
construction walk - through, Suzanne discovered a sizable portion of unused
space off the bridge above the master bath.