Having to close the main
spillway seems a bit unfortunate but nothing to do with the hydrology or the spectre of mega-floods.
Not exact matches
The design capacity of the Oroville
spillway derived using the PMP methodology was not exceeded it
seems.
Re: «The design capacity of the Oroville
spillway derived using the PMP methodology was not exceeded it
seems.»