(clockwise from top left) the ground floor was excavated and rigid insulation placed around the perimeter to cut thermal bridging
here; airtightness taping around joist ends; new roof rafters insulated with Icynene
spray foam insulation; airtightness detailing to the roof, with Pro Clima Intello membrane under internal battening.