In the
standard model, it was believed that planets like the Earth and Jupiter around the Sun would be formed after the central star
of the
solar system (the Sun) has grown mature to a certain phase.
Cutting edge data centers
of the future will require less
of a physical human presence, and are likely to: â $ cents Rely on a VIL to optimize equipment management and provide for virtual remote control capable
of instant changes, switches and adds â $ cents Achieve LEED certification for the physical building â $ cents Rely on more efficient water cooling that potentially takes advantage
of an on - site tower to chill water for cooling the
system (thus reducing energy consumption by using nature's natural cooling power to chill water) â $ cents Use fluid dynamics
models to precisely design the interior
of the building to maximize the efficiency
of the HV / AC
system for air - cooled computing
systems â $ cents Tap into a mixed energy grid that relies on green energy sources such as
solar, wind or hydroelectric (depending on geographic feasibility), along with a reliable city grid thus avoiding the need for the
standard back - up Uninterruptible Power Supply (which will reduce equipment costs, minimize floor space used, and increase energy efficiency because
systems that employ a UPS convert AC to DC and back, incurring substantial energy losses).