«Further we believe that even if the [School Construction Authority] were to adhere to
its stated construction schedule and the verbally proposed September 1 move - in dates — less than a week before schools open — it would preclude the schools from setting up operations in time for the 2015 - 2016 school year,» CEC 3's letter stated.
Not exact matches
SolarCity is among the largest installers of rooftop solar arrays on Long Island and the U.S. Cooper said
construction of the solar - panel plant is «proceeding well, and we are looking forward to working with New York
state to accelerate the full - scale production
schedule.»
The design - build process permits an expedited
construction schedule compared to traditional
state contracting, and offers significant cost savings with less risk to
state taxpayers of design changes and resulting cost overruns.
This led to an efficient, timely, and highly successful bidding process which produced the highest upfront payment ever offered to the
State — $ 380 million — with enhanced MWBE participation, community involvement, and an accelerated
construction schedule.»
The
state Legislature's budget committee is
scheduled to vote Wednesday on a proposal containing an estimated $ 7.5 million tax exemption for
construction companies that do work for nonprofit groups.
Construction Temporarily Limited Due to Winter Weather Tappan Zee Constructors (TZC) is
scheduled to re-stripe the westbound lanes near the new bridge tonight, requiring lane closures on the northbound / westbound New York
State Thruway (I - 87 / I - 287).
MANHATTAN — A feud between Inwood City Councilmen Robert Jackson, City Councilman Ydanis Rodriguez and
State Senator Adriano Espaillat over a Columbia University
construction project has resulted in dueling community meetings
scheduled for this weekend.
On January 8, jury selection is
scheduled to start in the trial of Cuomo's former close confidant and aide Joe Percoco, along with three
construction and energy executives who had business before the
state and are accused of arranging bribes for Percoco and his wife in exchange for Percoco's government influence.
Because of nagging concerns over the
construction schedule of the reactor, the ITER council, which represents the seven international partners in the project — China, the European Union, India, Japan, South Korea, Russia, and the United
States — did not give the expected rubber stamp to the thousands of pages of documents that fully define the project.
They gave $ 28 million to Michigan
State University, Eli Broad's alma mater, for the
construction of the Eli and Edythe Broad Art Museum at MSU, designed by Zaha Hadid and
scheduled to open in 2012.
The resort, backed by China's
state - run Export - Import Bank and constructed by thousands of Chinese workers employed by China State Construction Engineering Corp., had originally been scheduled to open to the public by the end of
state - run Export - Import Bank and constructed by thousands of Chinese workers employed by China
State Construction Engineering Corp., had originally been scheduled to open to the public by the end of
State Construction Engineering Corp., had originally been
scheduled to open to the public by the end of 2014.
Scheduled for completion in 2018, the
construction will result in modernized exhibition halls, providing
state - of - the - art facilities for exhibitors and visitors.
The event officially began the 15 - month
construction phase of the $ 30 million project,
scheduled to end in August, 2009 when the bridge will reopen as the world's longest elevated park in time to serve as the centerpiece of the
state's Quadricentennial Celebration.
Those estimated
construction schedules, taken from NERC observation of past projects, likely mean that the CPP's timeframe — which would have
states make significant emissions cuts in anticipation of the beginning of the compliance period in 2020 — likely needs to be extended.
that in 2010, «
Construction did not begin on a single new coal - fired power plant in the United
States for the second straight year,» with plans for 38 new plants dropped and even more older plants
scheduled for retirement.
Unfortunately, the
construction industry in the United
States can be focused more on
schedules and profit, and less on quality.
The past 15 years I have provided my cost
schedule controls
construction employment services throughout the western United
States.
Certificate for QA / QC Management — U.S. Army Corps of Engineers Certificate Field Inspector — ACI Primavera Advanced Project Manager Course MSHA 40 - Hour Training • OSHA 40 - hour Training Project Manager Basic Course — Primavera Certificate Engineering and
Construction — Primavera 5.0 Contractor Advanced
Scheduling — Primavera AGC Heavy Civil Supervisory training 2002 Advanced Technical Engineering Course — 1996 United
States Army Civil Technical Engineering School 42 Semester Hours United
States Army Basic Training — 1992