Green Building Store continues to fine tune passive house design and
construction techniques with exacting attention to detail, as demonstrated by its latest superinsulated,
stone - clad cavity wall house in West Yorkshire.
Cleaned all
construction areas to avoid hazards.Mixed and laid concrete to raise top of manhole to the street level.Mixed mortar, plaster and grout according to standard formulas.Performed heavy labor such as ditch digging, paving and hauling.Mentored junior team members, providing guidance on proper
techniques and safety.Installed, repaired and rebuilt tile, brick and
stone surfaces.Used grouting trowels to apply grout between joints of bricks and tiles.Continually cleaned work areas and equipment.Arranged and stored materials, machines, tools and equipment.Cut materials to specified sizes for installation using power saws and tile cutters.Transported materials, tools and machines to installation sites.Used a pick and shovel to dig, spread and level dirt and gravel.