Sentences with phrase «storm plan a model»

Not exact matches

One suggestion is to spend $ 400 thousand for phase 3 of the Transportation plan and storm sewer model but Councillor Gary Sullivan questions whether you should pay for any plan if there's no money to carry through.
One of the members, senior project coordinator Jim Sipes of the Atlanta office of EDAW, a landscape architecture and planning firm, exploited existing data to model which low - lying regions are most at risk from storm surges and flooding and where the most vulnerable populations are concentrated.
Healing Gifts: Creating serene environments, savvy financial planning, holding down the fort during turbulent times, calm in the storm, practical magic, teaching / modeling traditional wisdom
Also planned is a storming A25 AMG 4Matic model.
Last year's storm in Atlanta was predicted based on models that saw only the south half of Atlanta getting any significant amounts * and action was planned accordingly.
• Studied plans for hydraulic modeling and designed associated tasks for creating storm water drainage and flood management systems • Developed reports on the engineering studies to coordinate technical staff with engineering on projects • Created blueprints and presentation drawings
Environmental Engineer — Duties & Responsibilities Trained environmental engineer with experience in industrial and academic settings Oversee development and feasibility study of a new low level chlorine detection method by nanotechnology Direct identification and quantification of sulfate - reducing bacteria (SRB) and sulfur - oxidizing bacteria (SOB) by Real Time Polymerase Chain Reaction (RT - PCR) Lead research for «Control of distribution system water quality in a changing water quality environment» funded by Tampa Bay Water Authority, Water Research Foundation Responsible for analyzing biological parameters and interpreting data from distribution system samples Manage QA / QC and sampling protocol for all biological project samples Compose and organize the entire biological sections for final project reports Develop and verify empirical models relating biofilm density and HPC measurements to water quality Responsible for designing water, sewer, fire, and storm drainage systems for a 3 story building Composed an Operations & Maintenance Manual for drainage systems Drafted full - size CAD blue prints of drainage systems and other structures Proficient in water / waste water treatment, experimental design, and laboratory studies Provide research for a project studying the effects of ultra-filtration on oily waste water Create a full 40 MGD water treatment plant process and design for a fictional city in North China Oversee site and source water selection, water pump stations design, treatment plant planning and pipeline layout Drafted full - size CAD blue prints and composed an Operations & Maintenance Manual Experience with hydraulic modeling and waste water plant design Consistently recognized for excellence in team leadership, project management, and academic study
a b c d e f g h i j k l m n o p q r s t u v w x y z