Last year, Skelos sought to hang on to the majority leader post after a criminal complaint was filed against him and his son for conspiring to aid AbTech's pursuit of contracts for
storm water projects.
Not exact matches
To do so, the Federation has taken unprecedented action, helping to coordinate hundreds of donation drives in the U.S. mainland, distributing millions of pounds of food,
water and essentials to those most affected by the
storm, delivering emergency relief aid to the 78 hard - hit municipalities, and seeding 13 million dollars to support emergency relief and recovery
projects throughout Puerto Rico.
To do so, the Hispanic Federation has taken unprecedented action, helping to coordinate hundreds of donation drives in the U.S. mainland, distributing millions of pounds of food,
water and essentials to those most affected by the
storm, delivering emergency relief aid to the 78 hard - hit municipalities, and seeding 15 million dollars to support emergency relief and recovery
projects throughout Puerto Rico.
The park, which is part of a
storm -
water retention
project, will feature a cobblestone - rimmed pond, pedestrian path and bench seating, a flower garden and a view of the DuPage River.
The Village Board voted unanimously this week to reject all bids for a
storm -
water project in Ackerman Park, 800 St. Charles Rd.. The
project to create a
storm -
water detention basin is now back to square one, officials said.
The stabilization
project started after officials found that
storm water runoff was eroding the banks of the stream and depositing pollutants into existing wetlands, according to the Park District.
District 181 officials are reluctant to discuss the issue, but a Tribune analysis of district documents shows the overruns can be attributed, in part, to poor planning, personality clashes and a rush to complete the
project even while battles raged over land ownership and
storm -
water and zoning issues.
By providing a setting for the salt marsh to migrate, Rough Meadows is
projected to play a key role in assisting this important coastal ecosystem threatened by sea level rise, while also providing tangible public health and safety benefits by storing flood
waters and blunting
storm surge in the important years ahead.
The District's Planning and Athletics Departments are developing a comprehensive sports field master plan that will address existing fields to meet current and
projected program needs as well as explore potential new field configurations that would gain efficiencies in scheduling, program management, and tournament opportunities; ancillary amenities and infrastructure; maintenance;
storm water management, lighting and utilities; as well as improved parking management strategies.
Adam Skelos heard bragging of assurances from Nassau County about contracts in wiretapped conversation In this wiretapped conversation played Tuesday, Nov. 24, 2015 in court, Adam Skelos bragged to the head of AbTech Industries, which had secured a $ 12 million contract with Nassau County at his urging, that he had assurances directly from County Executive Edward Mangano that the
storm water cleanup
project would be funded after a series of delays threatened Adam's consulting job with the company.
The
project also included the development of an initiative that collects
water to help alleviate
storm water runoff.
Adam Skelos bragged to the head of AbTech Industries, which had secured a $ 12 million contract with Nassau County at his urging, that he had direct assurances from County Executive Edward Mangano that a
storm water cleanup
project would be funded after a series of delays threatened Skelos» consulting job with the company, a wiretapped phone call revealed yesterday.
Picente has asked the Oneida County Board of Legislators to commit $ 500,000 to address the public works
projects within the municipalities that were severely impacted by the
storm water runoff or flooding from their waterways or bodies of
water.
The
project, if constructed, would install antimicrobial sponge technology in
storm -
water drainpipes to filter pollutants before they reach waterways.
Another county official said that if Nassau decides to proceed with the full
project to install
storm -
water - treatment technology, it could issue a new bid for the construction.
Nassau officials say the contract language makes it clear that the bulk of the work on the
storm -
water project can't take place without «design - build» authorization.
Adam Skelos bragged to the head of AbTech Industries, which had secured a $ 12 million contract with Nassau County at his urging, that he had direct assurances from County Executive Edward Mangano that a
storm water cleanup
project would be funded after a series of delays threatened Skelos» consulting job with the company, a wiretapped phone call revealed Tuesday.
During the joint appearance in Oceanside, L.I., to announce a Nassau County
water treatment plant
project, Cuomo invoked Winston Churchill's motto of «never given in» to say how New York tackled the aftermath of the devastating
storm.
Adam Skelos then became involved in an environmental technology company, identified in press reports as Abtech, despite admitting in meetings that he had no background on
storm -
water treatment
projects that were the backbone of the company's business.
In the RISK
Project, researchers found that stressors such as going without food or
water after the
storm or, worse, losing a loved one predicted longer - term mental health struggles, as did reporting a weak social support network before Katrina.
For example, «plant a million trees»
projects are becoming popular as a way to store carbon dioxide, slow heat rise and soak up
storm water.
A new study could bolster
water conservation efforts in L.A., including
projects like this wetland park, which treats
storm water.
The Tunnel and Reservoir Plan (TARP, also known as the Deep Tunnel
Project) was created to intercept
storm water runoff and raw sewage overflow.
The tunnel
projects will continue to store
storm and sewer waste
water until a time when it can be treated and released to the Illinois and Mississippi Rivers.»
Some things we might do if we got desperate enough: scrub greenhouse gasses from the atmosphere technologically, geo - engineering to create cooling effects to offset greenhouse heating, [SLIDE 42] lots of adaptation policies, cropping patterns, heat drought and salt - resistant crops, strengthen public health and environmental engineering defenses against tropical disease, new
water projects for flood control and drought management, dyke
storm surge barriers, avoiding further development on flood plains in near sea level.
From 2000 on, she created public
projects for wetlands, rivers, streams and
storm -
water runoff that unite
water remediation and public art.
Jackie Brookner is a New York — based artist who creates public
projects for wetlands, rivers, streams, and
storm -
water runoff that unite
water remediation and public art.
As of Sunday night, the
storm, still a tropical depression, had finished pummeling the Yucatan Peninsula and was
projected to strengthen over warm Gulf of Mexico
waters before making landfall on shores in the western gulf (although some models still calculate a possible risk to the oily east).
Last time, the chapter on that continent began with a declaration that up to a quarter of a billion Africans «are
projected to be exposed to increased
water stress due The draft report lays out eight «key risks,» including sea level rise and
storm surges that could affect hundreds of millions.
According to de Boer, the fund is intended to finance climate change
projects including sea walls to guard against expanding oceans, early warning systems for extreme events, improved
water supplies for drought areas, training in new agricultural techniques and the conservation and restoration of mangroves to protect people from
storms.
Longwood Gardens received both the Diamond Award Certificate in the
Water and
Storm Water category from the American Council of Engineering Companies» (ACEC) Pennsylvania Chapter and an Honorable Mention as an Outstanding
Project by the Philadelphia Chapter of the PA Society of Professional Engineers (PSPE).
These changes combined with higher sea levels and associated
storm surges, more intense droughts, and increased precipitation variability are
projected to lead to increased stresses to
water, agriculture, economic activities and urban and rural settlements (high confidence).
EPA mpg for plug - ins difficult to determine... EcoRenovator — DIY energy saving
projects... Update on multiwall polycarbonate
storm windows... Update on PET bottle solar
water heater design... Keeping the pipes from freezing when away (without fuel)... Freedom's solar heated stock
watering tank... October performance for $ 1K solar
water heating system... Tom's 5.5 KW wind turbine, and 140 ft tilt - up tower — full construction details... ----- > Canuckle sun tracker... Solar Livestock Handbook available again...
And what the rest of coastal USA is doing about this, has nothing to do with rain barrels, oyster reefs, buffer zone plantings, Bacterra
Storm Water Filters, picking up soda cans in the marshes and some of the other feel good - do nothing
projects that the Virginian Pilot has been promoting to an incredibly naïve local population for several years now.
We need tidal marshes, not granite rip rap sills, volunteer trash pickup programs, oyster reefs, rain barrels, expensive Bacterra
storm water filers, buffer zone shrub plantings and the other feel good - do nothing
projects that you are so anxious to promote.
The government has allocated $ 17 million (USD) for the
projects, which include boosting the amount of recycled
water used for irrigation,
storm water capture and reuse, revving up the capacity of
water recycling plants, and improving the
water pipeline infrastructure.
Prepare and review construction drawings, construction documents and contracts, cost estimates and procedures, details and specifications for construction of
projects involving
water, sewer and
storm drain facilities.
Implemented
project erosion control plan, monitored the erosion control devices and wrote
storm water reports.
Prepared construction estimates for site grading,
storm sewer, sanitary sewer,
water main, and portland cement concrete paving
projects.
Macomb County Public Works Commissioner (CTI Inc.), St. Clair Shores • MI 3/2007 — 3/2009 Chapaton Retention Treatment Basin Pump Station Refurbishment
Project Manager Managed refurbishment of three
storm water pumps with 250,000 GPM and 2750 HP through financial assistance from the State Revolving Loan Funds.
Excavated and Graded the Watershed
Project and provided
Storm Water Mitigation Plan; including catch basins, dams, and de-silting basins; established all BMP's
• Studied plans for hydraulic modeling and designed associated tasks for creating
storm water drainage and flood management systems • Developed reports on the engineering studies to coordinate technical staff with engineering on
projects • Created blueprints and presentation drawings
Jason Associates Corporation • Yuma, AZ 04/2008 — 10/2008 Senior Environmental Scientist,
Project Manager Managed a wide variety of
projects for US Army Yuma Proving Ground including NEPA environmental assessments, biological evaluations,
storm water pollution prevention plans, and other environmental compliance issues.
5/1/2015 — 7/1/2015 Civil Engineering Intern,
Water Resources Dewberry — Fairfax, VA Worked on water resource projects such as storm water management, water, and wastewater enginee
Water Resources Dewberry — Fairfax, VA Worked on
water resource projects such as storm water management, water, and wastewater enginee
water resource
projects such as
storm water management, water, and wastewater enginee
water management,
water, and wastewater enginee
water, and wastewater engineering.
Tags for this Online Resume: Design, Plan, Specification, Estimate, Inspection, Construction Contract Document Management,
Project Management Oversight Overseer,
Water supply distribution engineering,
Storm / Sanitary Collection System
Tags for this Online Resume:
Project Manager, Construction Manager, Sustainable Building, Renewable Energy, Land Development, Land Development,
Storm water Management,
Storm water Management
Oversaw several
projects that equipped local municipality with sewer and
storm -
water retention solutions.
Qualification summary EXPERIENCED IN CONSTRUCTION, ON - SITE AND OFF - SITE * Superintendent on five (5) off - site
projects, grading,
storm, sewer,
water, joint trench, side walk, curb and gutter, paved, and county sign offs for completion.
Managed assemblage for subdivision, buildable yield Key Highlights: • Provided
Project Management oversight for Phase I A, Flood Plane Studies, Archeological Studies, Geotechnical Studies, Civil Engineering,
Storm Water Management, Erosion, Zoning, site utilities, and Well and Septic.
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior
Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new
storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction
project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot
water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed
project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing const
project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction