While New England remains a summer peaking electricity system (with a forecasted 2018 summer peak around 25 percent higher than the forecasted 2018/2019 winter peak), winter peak forecasts are important for assessing the impacts of electric
system reliability during a period when much of New England's energy infrastructure is dedicated to space heating (i.e., when interstate natural gas pipelines are used both for electricity generation and for heating homes and businesses).
Not exact matches
Worryingly, the
system froze once and required a reboot
during a test drive, reminding me that older InControl iterations have suffered
reliability issues.
Largely gone are the days of vital
systems going wrong
during the first few years of ownership, and, combined with the popularity of leasing and manufacturer - backed service plans, it's really a vehicle's second or third owners that have to even consider long - term
reliability.
The trial ran for 6 weeks and
during that time we fully tested the full
system for
reliability and faults.
Wind power
system performance and
reliability continued to improve throughout the year, and costs proved even more competitive with record low tenders
during the year.
The design - flood return period is essentially an estimate of
system reliability, because failure should not occur
during more frequent (less severe) events.»
Electric
system reliability will always be defined by the ability to turn on the lights
during the black swan events.
Summary of Qualifications Experienced, dedicated, and highly qualified Board Operator / Shift Supervisor with expertise in diagnosing, repairing, and ensuring the
reliability of electrical generating units, compressors, pressure
systems and various other units
during plant operations.