Though some models show that the
target can still be met, those make «heroic assumptions» — immediate
global cooperation, for instance, or the sudden, wide
availability of new technologies.
In addition to its incredible efficiency 10 % higher than the
global average, the plant has achieved extremely high
availability, particularly during the second year of operation with a 97 %
availability rate (excluding planned outages), exceeding its
target rate while allowing TNB to reliably deliver full base load to the grid.