Not exact matches
The ORR had concluded that the
airport is not permitted to introduce higher charges for train
operators that take into account the long
term construction costs of the 8 km railway spur, used by Heathrow Express services, into central London.
The contract follows the signing of a head of
terms commercial agreement by the two parties in June 2012 and the decision by the
airport's owner and operator to integrate LLAL's futureLuToN: Optimisation programme with LLAOL's plans to increase passenger capacity at London Luton A
airport's owner and
operator to integrate LLAL's futureLuToN: Optimisation programme with LLAOL's plans to increase passenger capacity at London Luton
AirportAirport.