Liquid Robotics» Wave Glider, an autonomous surface ocean robot, will be the core technology to conduct long -
term environmental monitoring and -LSB-...]
There is a long -
term environmental monitoring and research project, investigating marine ecology around Rothera Point.
Liquid Robotics» Wave Glider, an autonomous surface ocean robot, will be the core technology to conduct long -
term environmental monitoring and surveillance of the Pacific's most diverse and endangered underwater ecosystems.
The long -
term environmental monitoring techniques used in the current study should help researchers to continue improving river management practices, improve ensemble forecasts and improve understanding of how nutrients move through the Mississippi River and the Atchafalaya River, ultimately flowing into the Gulf of Mexico.
Not exact matches
The report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2014 - 15, complementing previous short
term monitoring and evaluation work undertaken in 2012 - 13 and 2013 - 14.
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Edward - Wakool river system.
This report is the product of the first year of
monitoring and evaluation in the Lower Murray River under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Lower Murray River under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
The Commonwealth
Environmental Water Office has been monitoring and evaluating the short - term (annual) environmental response of selected watering actions in the Murrumbidgee during the 2011 - 12, 2012 - 13, and 2013 - 14
Environmental Water Office has been
monitoring and evaluating the short -
term (annual)
environmental response of selected watering actions in the Murrumbidgee during the 2011 - 12, 2012 - 13, and 2013 - 14
environmental response of selected watering actions in the Murrumbidgee during the 2011 - 12, 2012 - 13, and 2013 - 14 water years.
Commonwealth
Environmental Water Office long -
term intervention
monitoring program Murrumbidgee River system Selected Area, 2014 - 15 Synthesis report
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project: Lower Lachlan River System, 2016 - 17 Annual Report
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project Goulburn River Selected Area evaluation report 2016 — 17
The report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2016 - 17, complementing the first two years of LTIM Project
monitoring and evaluation work undertaken in 2014 - 15 and 2015 - 16 and previous short
term monitoring and evaluation work undertaken in 2012 - 13 and 2013 - 14.
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Lachlan river system.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project: Lower Lachlan river system Selected Area 2014 - 15 Annual
Monitoring and Evaluation Report
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project Lachlan River System
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project: Edward - Wakool Selected Area Technical and Synthesis Reports, 2014 - 15
The reports evaluate the contribution of Commonwealth
environmental water to
environmental outcomes in 2014 - 15, complementing previous short
term monitoring and evaluation work undertaken in previous years.
The Commonwealth
Environmental Water Office contracted the NSW Department of Primary Industries — Fisheries to undertake a short -
term monitoring project to assess the response of native fish in the lower Macquarie River to the connection flow.
This report is the product of the first year of
monitoring and evaluation in the Goulburn River under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Goulburn River under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
This report is the product of the first year of
monitoring and evaluation in the Lachlan catchment under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Lachlan catchment under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
This report is the product of the third year of
monitoring and evaluation in the Goulburn River under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Goulburn River under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
Commonwealth
Environmental Water Office Long -
Term Intervention
Monitoring Project Lower Murray River Selected Area
Monitoring and Evaluation Plan Version 2
Commonwealth
Environmental Water Office Long -
Term Intervention
Monitoring Project: Basin Evaluation Plan
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Junction of the Warrego and Darling rivers.
Monitoring of
environmental responses has been strengthened by transitioning from short (annual) to longer
term (5 - yearly) projects as part of the $ 30 million Long Term Intervention Monitoring Proj
term (5 - yearly) projects as part of the $ 30 million Long
Term Intervention Monitoring Proj
Term Intervention
Monitoring Project.
This report is the product of the second year of
monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project junction of the Warrego and Darling rivers Selected Area 2015 - 16 Evaluation Report
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Goulburn river system.
Long
Term Intervention
Monitoring (LTIM) is a key element of the Commonwealth
Environmental Water Office (CEWO) response to the requirements of the Water Act and Basin Plan.
This report is the product of the second year of
monitoring and evaluation in the Edward - Wakool River system under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Edward - Wakool River system under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
The Commonwealth
Environmental Water Office (CEWO) Long Term Intervention Monitoring (LTIM) Project seeks to quantify the outcomes of the management of Commonwealth environmental water and its contribution to achieving the requirements of th
Environmental Water Office (CEWO) Long
Term Intervention
Monitoring (LTIM) Project seeks to quantify the outcomes of the management of Commonwealth
environmental water and its contribution to achieving the requirements of th
environmental water and its contribution to achieving the requirements of the Basin Plan.
Long -
Term Intervention
Monitoring of the Ecological Responses to Commonwealth
Environmental Water Delivered to the Lower Murray River Selected Area in 2015/16
The Commonwealth
Environmental Water Office funded monitoring activities to evaluate the short - term (annual) environmental response of selected watering actions in the Macquarie river system in 2014 - 15 a
Environmental Water Office funded
monitoring activities to evaluate the short -
term (annual)
environmental response of selected watering actions in the Macquarie river system in 2014 - 15 a
environmental response of selected watering actions in the Macquarie river system in 2014 - 15 and 2016 - 17.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring: Standard Methods
This report is the product of the third year of
monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Junction of the Warrego and Darling Rivers under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
The Commonwealth
Environmental Water Office contracted the CSIRO to undertake a short -
term monitoring project to assess the impacts of predation on breeding colonies, where waterbirds forage and roost, and their dispersal patterns after breeding.
The Commonwealth
Environmental Water Office Long Term Intervention Monitoring Project aims to monitor and evaluate the contribution of Commonwealth environmental water delivery in the Murray - Darling Basin over 5 years
Environmental Water Office Long
Term Intervention
Monitoring Project aims to
monitor and evaluate the contribution of Commonwealth
environmental water delivery in the Murray - Darling Basin over 5 years
environmental water delivery in the Murray - Darling Basin over 5 years to June 2019.
The report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2015 - 16, complementing the first year of LTIM Project
monitoring and evaluation work undertaken in 2014 - 15 and previous short
term monitoring and evaluation work undertaken in 2012 — 13 and 2013 — 14.
This report is the product of the second year of
monitoring and evaluation in the Murrumbidgee under the Commonwealth Environmental Water Office's Long Term Intervention Monitoring (LTIM
monitoring and evaluation in the Murrumbidgee under the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
The Commonwealth
Environmental Water Office contracted WaterNSW to undertake a short -
term monitoring project to
monitor the hydrology in the lower Macquarie River during the connection flow.
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Lower Murray river system.
The report evaluates the contribution of Commonwealth
environmental water to
environmental outcomes in 2015 - 16, complementing the first year of LTIM Project
monitoring and evaluation work undertaken in 2014 - 15 and previous short
term monitoring and evaluation work undertaken in 2011 - 12, 2012 - 13, 2013 - 14.
This report is the product of the first year of
monitoring and evaluation at the whole of Basin - scale as part of the Commonwealth Environmental Water Office's five - year Long Term Intervention Monitoring (LTIM
monitoring and evaluation at the whole of Basin - scale as part of the Commonwealth
Environmental Water Office's five - year Long
Term Intervention
Monitoring (LTIM
Monitoring (LTIM) Project.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project Goulburn River Selected Area evaluation report 2015 - 16
The CSIRO conducted short -
term monitoring on behalf of the Commonwealth
Environmental Water Holder to assess both the impacts of predators during waterbird breeding and the birds» patterns of movement away from the colony during and after breeding.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project Gwydir River System Selected Area — 2014 - 15 Evaluation Report
The Commonwealth
Environmental Water Office contracted the NSW Department of Primary Industries Fisheries to undertake a short - term monitoring project to assess the response of native fish in the Macquarie River to these environ
Environmental Water Office contracted the NSW Department of Primary Industries Fisheries to undertake a short -
term monitoring project to assess the response of native fish in the Macquarie River to these
environmentalenvironmental flows.
As part of the Commonwealth
Environmental Water Office's Long
Term Intervention
Monitoring Project, a detailed
Monitoring and Evaluation Plan has been developed for the Gwydir river system.
Commonwealth
Environmental Water Office Long
Term Intervention
Monitoring Project: Lower Lachlan river system 2015 - 16 Synthesis Report
Our long -
term intervention
monitoring (LTIM) researchers are well placed to understand and report on the benefits of natural flows (as distinct from
environmental water flows) and how we might mimic similar conditions through
environmental water delivery to stimulate future events.