Sentences with phrase «timely project configuration»

Manage all information, documentation and records through the project life cycle through the development of processes / procedures / standards / workflows / reports / tools and workspaces for the purpose of facilitating complete, accurate and timely project configuration management.

Not exact matches

Smartronix (CA & MD) 08/2004 — 12/2008 S6 Information Systems Coordinator • Serve as Section Chief and Contract Lead at the MCNOSC providing overall support for the MCNOSC IT Systems • Manage the network, servers, switches, applications, and information and infrastructure security • Utilize DoD applications for network scanning and remediation of the classified and unclassified networks • Develop plans, procedures, and policies to directly support and defend the MCNOSC Network from security threats • Oversee the MCNOSC's PKI (public key infrastructure) and integration with the MCNOSC services with the coordination of recovery strategies with the Alternate Network Operations and Security Center (AltNOSC) • Determine minimum processing requirements for recovery site and provide guidance for recovering infrastructure processing • Provide technical input to the Contingency of Operations (COOP) Plan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learned)
Network Engineer — Duties & Responsibilities Serve as network engineer and perform configuration of routers, wireless access points, and switches Test, upgrade, and configuring Cisco 800 to 7000 series routers and Catalyst 500g to 6500 series switches Train team in TBU, Firsting and Seconding Process, ATT company engineering and item and lab tracking applications Work on several large scale, long term projects when not assisting on LAN configurations Install and maintain customer voice network and perform end user training to administrators and users Function as lead engineer on several IPT / Network installations for school districts Perform many Call Manager installations, migrations, and upgrades Maintain IPT infrastructure and provide end - user training to customers on functions and features of IP and digital phones Implement Call Manager Express for government establishment Assist on massive IPT migration for major retail chain Configure and install PBX systems designed by Alcatel Lucent Provide exceptional and timely customer service Represent company brand with poise, integrity, and positivity
• Installed, configured, and managed multiple web sites supporting global e-commerce and e-business credit in technical environments comprised of Solaris 8 - 10 (LDOMS, ZFS, RAID, ZONES, CONTAINERS), Aix 6.1 - 7.1, Linux 4.0 - 5.5, Web Sphere MQ, Apache, Jboss, ATG, DB2, Oracle, MySQL and VMware • Optimized data security through close cooperation between Network Administration, Unix System Administration, NT Administration, DBA, and Backup and Recovery Administration teams • Installed Emulex LPFc, EMC Power path, Navisphere, Veritas Volume Manager, Veritas cluster server, Veritas File system, Veritas Net Backup etc. and archived original configuration • Utilized expertise in managing and performance tuning major RDBMS Oracle / Sybase / SQL / Informix / DB2 / ATG / SAP • Built and configured IBM, HP and Sun servers, EMC, TSM and Sun SAN • Architected Disaster Recovery System, conducted testing, observed fail errors, and reset the systems • Compiled opensource applications and packages as necessary for the source of both Solaris and RPM packages • Installed and configured Nagios, Cacti and MRTG graphing tool to monitor and visualize servers and network devices • Managed Send Mail, SFTP, FTP, HTTP, SSL, SSH, DHCP, DNS, NIS, NIS +, DHCP, LDAP, Apache, Tomcat, Web Sphere, BMC Patrol, HP Open View, and Nagios • Coordinated efforts among Development, QA, Production, DR, Systems, DBA, Production, Support, Network Administration, and Applications groups for project completion ahead of schedule and under budget • Planned and developed projects, performed user acceptance tests, and applied patches to fix bugs • Served as liaison with vendors multiple vendors including Cisco, EMC, HP, IBM, Red Hat Linux, Oracle, Sun, and Symantec resolving hardware and software issues in a timely and professional manner
a b c d e f g h i j k l m n o p q r s t u v w x y z