Quinn notes that «
total landed costs» vs. the cost of real estate now figure into location of new distribution hubs.
Not exact matches
Yet by the late 1980s, when the real estate bubble was still being inflated, household and corporate replacement
costs of buildings left
land with only about 28 percent of
total property values.
Making the same adjustment for residential housing that the Fed made for corporate buildings — in valuing them at their historical
cost — would raise residential
land values to 60 percent of the
total (equal to the 1990 figure).
Besides the
land purchase, the village estimated site development will
cost $ 350,000, design fees $ 15,000 and contingency
costs at about 15 percent of site development, or $ 52,000, for a
total of $ 837,000.
Again, the PPPRA's template also showed that at N83 per litre, the Federal Government is making a gain of N10.72 for every litre, as it puts the Expected Open Market Price, which is the
Landing Cost plus
Total Margins at N72.28 per litre.
He said: «In continuation of the counter insurgency, the air component in the last one month conducted 286 operational sorties against terrorists» targets from 25 December to date in the Sambisa forest covering an area of 157,000 km2 which is equivalent to the
total land mass of South Korea, Portugal and Togo in a
total of 536 hours, 21 minutes were flown by various platforms engaged in the operations, «This translates into 316,637.5 litres of aviation fuel which amounts to N60.3 million, excluding the
cost of maintenance and armament expended.»
The new bridge will be built on
land and assembled by the crane — a time saver that helped the contractors underbid their nearest competitors by $ 800 million, or about a quarter of the
total project
cost, CBS 2's Lou Young reported in January.
The PPPRA's template also showed that at N83 per litre, the Federal Government is making a gain of N10.72 for every litre, as it puts the Expected Open Market Price, which is the
Landing Cost plus
Total Margins at N72.28 per litre.
• The
total costs for the purchase and ongoing management of
land in Sabah, Malaysia, that would link fragments of...
After all, the roughly 1,200 square kilometers of
land on which New York sits is now valued at around $ 600 billion, much more than the
total cost of building the Big Apple.
The mission will
cost a
total of $ 325 million and should launch in 2007 and
land in 2008.
On average, the federal government contributes about 10 percent to the
total amount spent on public education, but these dollars account for a larger portion of many high - poverty districts» budgets.11 For example, Los Angeles Unified School District and Chicago Public Schools — both high - poverty districts — receive about 15 percent of their budgets from the Education Department.12 These dollars serve essential purposes, such as supplementing services for low - income students, defraying the
cost of individualized education programs for students with disabilities, and compensating for a loss of property tax due to federally owned
land.
2004
Land Rover Discovery ONLY 63,600 MILES Items Fixed over last 5,000 Miles — ALL RECEIPTS AVAILABLE
TOTAL COST OF UPGRADES AND REPAIRS: $ 6,646.94 (Not including minor items like wiper blades, clips, etc) 3 Power Door Lock Actuators New Lower cowl on front windshield Brand New full set of Oxygen Sensors (from Atlantic British) Replaced Cylinder Head Assembly — Both Banks delete throttle body heater Replaced Seals and Gaskets — Rear Axle — Pinion Seal $ 2291.58 Ignition Lock Replaced and Rekeyed — Backup Key Made Brand New Starter Motor Installed $ 688.60 New (used) set of 5 - 18 inch OEM
Land Rover Discovery Hurricane Wheels $ 350.00 4 New Cooper Discoverer 255 / 55 / R18 Tires installed 1 New Sentury 255 / 55 / R18 Tire installed on matching spare wheel $ 897.74 New Bosch Battery (Pep Boys) $ 164.89 New Track and Tie Rod and Drag Link — Full Alignment Completed $ 659.94 New OEM Look Keyless Entry New Window Tent $ 936.65 Pioneer Head unit — Bluetooth and rewire install $ 377.55 + $ 280.00 = $ 657.55 I am happy to help with meeting whoever the buyer chooses for shipping.
This number will be the
total cost of building your home; since you already own the
land, only the
cost of construction must be provided through a loan.
If purchasing a plot of
land for $ 200,000 and
total hard and soft
costs for construction will be $ 400,000, then the
total costs including
land will be $ 600,000.
To calculate the maximum loan amount, most lenders will consider lending up to a maximum of 75 % of the
total costs including
land in most urban centres.
Under the uses of funds section we first see the
Land Costs, Hard
Costs, and Soft
Costs totaling $ 11,666,667.
Type: Online calculator
Cost: Free Claim: Land transfer tax (LTT) is often overlooked when considering the total cost of purchasing a h
Cost: Free Claim:
Land transfer tax (LTT) is often overlooked when considering the
total cost of purchasing a h
cost of purchasing a home.
The
total projected «turn - the - lights - on»
cost of the 20,000 + square foot project is $ 6.5 million, including
land acquisition, site work, construction, professional fees, and furniture, fixtures and equipment.
Make the most of your time in the region and save 10 % off the
total expedition
cost when you combine your Peru:
Land of the Inca expedition with a voyage to Upper Amazon
Because they didn't have to buy the
land, the
total cost of the project was well below their budget: less than $ 500,000.
In my calculation the burial
cost was just 1 % of the
total costs of the CO2 snow sequestration; here is the breakdown of my estimate of $ 2400 / t CO2: Electricity = 65 % Deposition Plants = 34 %
Land fill (including insulation) = 1 %.
Recent research found that natural solutions like improved management of forests, wetlands, grasslands and agricultural
lands can remove about 5.6 GtCO2e of carbon per year by 2030 — a figure equivalent to
total global emissions from agriculture in 2014 — at a
cost of less than $ 100 per tonne of carbon.
The
total price per unit (including
land, construction and soft
costs) was $ 236,000.
A Major Renovation is any renovation of a building where (a) the
total cost of the renovation related to the building envelope or the technical building systems is higher than 25 % of the value of the building, excluding the value of the
land upon which the building is situated, or (b) more than 25 % of the surface of the building envelope undergoes renovation.
As shown in Figure 6, the range in ground loop lengths over the typcial range of soil thermal conductivities is 200 to 300 feet per system ton, which translates into a 30 - 50 % difference in required
land area, and a 10 - 20 % difference in
total system capital
cost.
These travelers will most likely benefit from an annual trip travel insurance policy, because it provides financial protection for them every time they travel to a foreign
land, and it
costs much less than the
total price of several single trip travel insurance policies.
The
total cost for this service is $ 29.95 and while this is an investment on your part, it is a small price to pay if it helps you to
land a great job.
As for the finished lot by itself, the raw
land and site preparation
cost the builder $ 21,717 and $ 21,534, respectively, with development fees and local government donations
totaling $ 3,700.
At its meeting in mid-May, NAR's Board of Directors approved the plan for the 12 - story building, to be located at 500 New Jersey Ave., N.W.
Total cost of the project, including
land acquisition and construction, is estimated at $ 45 million — but the building will ultimately save the association significant money, according to a committee of REALTORS ® that developed the building plan.
For example, the replacement
cost of a newly build - house would be equal to its
total development
cost plus the value of the
land.