The vessel will be installing the
turbines in
around 30 metres of water, up to six kilometres off the
coast of Miaoli County in North West Taiwan.
When the plane's remain have been lifted to dry land (outside the ring, of course) we shall then let the water back in, using the 12 000 ft drop to power
turbines, which will provide clean, green electricity for 1000 years, and as the ocean levels drop the walls
around the
coasts can be gradually removed.