Sentences with phrase «upgrade key sections»

We're committing an extra billion pounds to roads, including four major new schemes to: upgrade key sections of the A1, bringing the route from London to Newcastle up to motorway standard; link the A5 with the M1; dual the A30 in Cornwall; and upgrade the M25, which will support the biggest port developments in Europe, and I pay tribute to my

Not exact matches

Noble M12 GTO 3R 2004 (53), 31,300 Miles, Rebuilt Engine at 28,000 MIles With 438bhp and 415lbs / ft of Torque at a Standard 0.85 bar Boost with Upgraded Valve Springs and Exhaust Timing Set to M400 Specification, Quaife Automatic Torque biasing Limited Slip Differential, Track Day Sump, Metallic Black with Grey and Black Full Leather, Front Daytime LED Running Lights, Bespoke Leather Covered Dashboard, Electric Windows, Forward Swept Carbon Rear Wing with Black Uprights, M400 Type Side Pods, Rota GTR Gloss Black 18» Alloy Wheels with Michelin Pilot Super Sport Tyres, Re-profiled Rear Clamshell With LED Lamps, Carbon Drip Tray, Internally Mounted Light Weight Battery and Recent New Alternator, Push Button Ignition Without Key, HVAC System For More Effective Cabin Cooling and Air Distribution, Including Upgraded HVAC Blower Fan Without Heater, Custom Carbon Fibre Central Dash With Bespoke Switchgear, Supplementary Air Vents, Pace Products Intercooler, Hard Pipe Kit With Atmospheric Dump Valve and Atmospheric Oil Breather Tank, BCS Variable Tone Active Exhaust, Stainless Steel Including Stainless Steel Catalytic Converters and Flexi Sections.
, Upgrades - Blind - spot monitoring, Intelligent high beam, R - Sport Black Pack, Meridian Entertainment Sound, 1 owner, Full dealership history, Excellent bodywork, Black Full leather interior - Excellent Condition, Tyre condition Excellent, Standard Features - Satellite Navigation System, Panoramic Glass Roof with Tilt / Slide Front Section with Electric Blinds, Four Zone Climate Control with Air Filtration, Humidity Sensing and Separate Temperature Control for Driver, Front Passenger and Rear Right and Left Passengers, DAB Radio / Digital TV, Cruise Control and Automatic Speed Limiter, Front and Rear Parking Aid with Touch - Screen Visual Indicator / Rear Camera Parking Aid, Intelligent Stop / Start, Dual View Touchscreen, Interactive Voice - Audio, Bluetooth and Navigation, Dual View 8in Full Colour Touch - Screen Display, Jaguar Smart Key System - Keyless Start, Privacy Glass, Upholstery - Soft Grain Leather Perforated with Contrast Stitch (No Piping), Rain Sensing Windscreen Wipers, Tyre Pressure Monitoring System (TPMS), Radio with Front Media Interface / InControl Apps, Bluetooth - Including Audio and Video Streaming, Heated Front Windscreen with Timer, Alarm, Alloy Wheels - 20in Mataiva, Front and Rear Electric Windows with One - Touch Open / Close and Anti - Trap, Whiplash Protection System (Front Seats), Acoustic Laminated Glass / Solar Attenuating Glass / Privacy Glass Rear of B Post.
These black and yellow crates can only be unlocked by completing these key campaign sections and will provide you with a random set of emotes, Star Cards, credits and salvage (for upgrading and crafting Star Cards for multiplayer).
There were three key factors that drove the solar stocks and investor's sentiment throughout 2017: 1) Strong China solar market demand; 2) A technology driven capacity upgrade cycle; and 3) The Section 201.
Smartronix (CA & MD) 08/2004 — 12/2008 S6 Information Systems Coordinator • Serve as Section Chief and Contract Lead at the MCNOSC providing overall support for the MCNOSC IT Systems • Manage the network, servers, switches, applications, and information and infrastructure security • Utilize DoD applications for network scanning and remediation of the classified and unclassified networks • Develop plans, procedures, and policies to directly support and defend the MCNOSC Network from security threats • Oversee the MCNOSC's PKI (public key infrastructure) and integration with the MCNOSC services with the coordination of recovery strategies with the Alternate Network Operations and Security Center (AltNOSC) • Determine minimum processing requirements for recovery site and provide guidance for recovering infrastructure processing • Provide technical input to the Contingency of Operations (COOP) Plan ensuring all activities, resources and procedures required to recover critical IT infrastructure processing are accurate • Manage the day to day support of the MCNOSC Infrastructure, supervising a team of IT service contractors • Perform complex repairs, upgrades, hardware configuration, and end user training • Serve as project manager for the transition and deployment of the MCNOSC's NMCI plan • Oversee the planning and build out of the network and MCNOSC's new Headquarters and Operations Center • Coordinate with local contractors to ensure timely delivery of the network • Design and coordinate the build out of the MCNOSC Internal Data Center, Server Room, and Testing Lab • Coordinate the movement to the MCNOSC's newly built Operations Center and Head Quarters • Install cabling, servers, racks, environmental controls, a / v systems, and other technical equipment • Develop the MCNOSC IT Lifecycle management for the LAN and other IT devices • Serve as project manager for the MCCDC (Marine Corps Combat Development Center) Studies and Analysis Division and the MCCLL (Marine Corps Center for Lessons Learned)
a b c d e f g h i j k l m n o p q r s t u v w x y z