WA RRP RIDG 100 (2), RIVER S BRIDGE REPLACEMENT - bridge construction over a navigable water way and BNSF mainline tracks, MSE retaining walls, approach embankments, soft ground improvements, culverts,
utility line relocations, bridge demolition, and surfacing gravels.
Not exact matches
Pre-construction includes advanced
relocation of
utility lines prior to station construction.
Metro contractors are performing field work for Section 3 of the Purple
Line Extension to prepare for advanced
utility relocation.
Professional Affiliations ♦ ARMEA ♦ APWA ♦ PMI Professional Duties & Responsibilities Designed and directed construction of roadways, bridges, toll plazas, and train maintenance station Managed freeway modifications including road widening, ramp realignment, and overpass addition Oversaw gas
line installation,
utility relocation, and landscaping.