Sentences with phrase «volume production setting»

Bindery Operators work on a team in a fast - paced, heavy volume production setting.

Not exact matches

Set the price at your production cost, including both cost of goods and fixed costs at your current volume, plus a certain profit margin.
It requires a lot more energy and does a lot more damage doing say, 10 × 10 (or your 15 × 5), than it does doing one set of 25 - 50 or 50 - 100 reps.. In the end, you get less hypertrophy with high volume heavy lifting, because a) you still have all that myostatin buildup from heavy lifting suppressing hypertrophy, b) you don't sufficiently fatigue medium and fast twitch fibers, c) you don't get the increased IGF - 1 production and increased protein synthesis that you would get from high reps, and d) because the energy requirements of repairing the damage caused by heavy lifting are too high.
You also have to consider that with heavy lifting, you get the increased myostatin production inhibiting muscle growth, and you can't overcome that by simply increasing set volume.
In this collectible volume, go behind the scenes with production design, photographs and stills from the set — plus interviews with the cast and crew.
In this new collectible volume, go around the world with the Avengers in page after page of stunning concept art, production design, visual effects, revealing set photography, and commentary from cast and crew, including writer / director Joss Whedon and producer Kevin Feige.
Mazda Chairman, President and CEO Takashi Yamanouchi tells WardsAuto on the sidelines at the auto show here that production and sales volumes of the midsize car have fallen far short of the 100,000 - unit target set for North America when the second - generation Mazda6 launched in Flat Rock in autumn 2008.
This set a new record for volume production cars and the entire Nissan line.
As per news coming from Taiwan, trial production of the 5th gen iPad is set to kick off soon with volume production expected to begin in July.
Towards this, volume production of notebook devices based on Windows Blue is set to kick off in September.
The report also claims that HTC will push back the date it had previously set for volume production of its Flyer tablet, though it will supposedly still launch the device in the second quarter.
The company explains the pricing, mentioning that they are not making a profit on this upgrade, but it's still expensive because of the very low volumes and because the packs need to be hand - made (can't set up a robotized production line for just a few battery packs):
These changes address a concern that parties responding to document requests set forth a laundry list of boilerplate objections, produce a large volume of documents, but then state that the production is «subject to the objections,» leaving the receiving party with no sense of whether anything was actually withheld on the grounds of any of the objections.
General Electric (Stamford, CT) 2007 — 2008 Corporate Consultant — Infrastructure Systems & Network • Designed, developed, and engineered GE Treasury system's development, QA, Production, and DR environment • Hardware: Sun Fire V220, V480, V880, V1290, V6140, V6800, V6920; Sun Enterprise T2000, T5120 (Solaris 10: LDOMS, ZFS, RAID, Zoans, Containers), E10K, E15K, E25, M4000, M8000, M9000; HP ProLiant with Linux 5.0 (EMC and 3 PAR SAN) • Built servers from racking, cabling (Ethernet / fiber), connecting to network, setting serial connection to Avocent ports, and setting up server to the network through DNS • Performed massive installation of Solaris servers using both Jumpstart and Blade Logic and Red Hat using both PXE boot and BladeLogic servers to global distributed network of more than 6000 servers • Installed and configured Solaris 10 OS, recommended patches, hardening software, LDOMS, ZFS, and Container on Sun server • Installed and configured Emulex LPFC, EMC Power path, Navisphere, Veritas Volume Manager, Veritas Cluster Server, Veritas Volume Replicator, and Veritas Net Backup in heterogeneous environment • Partitioned and mirrored disks using Solaris LVM, disk suites, Veritas VxVM, mirrored root file system and set up alternate boot device and dump device • Installed application software for ITG, IDM, and Tibco etc. • Created and adjusted Oracle projects on oracle 9i and 10g • Configured operating systems, LDOMS, ZFS, RAID, network Multi Pathing, Cisco Switch 6309, Brocade Switch, EMC DS41000 fiber switch, EMC, 3 PAR and HITACHI SAN, DNS, NIS, NIS plus, LDAP • Created LUNs for EMC, 3 PAR, HITACHI SAN and set up RAIDS • Created zoning of Cisco 6309 switch • Provided connectivity of Ethernet ports and fiber channel by patching Ethernet ports from server panel to switch, and by patching fiber from server to Brocade switch then to EMC DS41000 switch through Cisco switch6300, 6309, Big IP • Performed alternate boot testing, crush dump testing and cluster testing • Vendor liaison for Cisco, HP, IBM, EMC, Symantec, Oracle Sun, and Red hat Linux resolving hardware and software issues • Scheduled changes and upgrades communicating with business owners and support team • Architected Disaster Recovery System conducted testing and resetting the systems as needed • Performed zoning and provisioning configured EMC / Power path LUNs on UNIX servers upon client's request • Resolved issues with NIS, NIS +, DNS, VxVM and VCS among other SA tasks • Created network topology of the internet and intranet security environment using Visio 7.5
a b c d e f g h i j k l m n o p q r s t u v w x y z