Sentences with phrase «water breaks throughout»

Keep refilling these or use sippy cups to provide lots of water breaks throughout the day.

Not exact matches

I do not have two more legs yet to make the 100 % to pick, where you actually need to run and go to the toilet just during the break,» while other employees even admitted to not drinking water throughout their work shift for fear of having to use the toilet.
Return flows from the use of Commonwealth environmental water in lower Broken Creek supported downstream actions throughout the Mid Murray, Lower Murray, Coorong and Lower Lakes, contributing to the protection, maintenance and improvement of the diversity and condition of water dependent native flora and fauna and ecosystem function.
Lead author, Capt. Leslie MacDonald, Sc.D., senior scientist in the U.S. Public Health Service, National Institute for Occupational Safety and Health, of the Centers for Disease Control, suggests that employees consider taking small steps to improve their overall cardiovascular health, including: • Going for a walk during lunch or other breaks • Parking farther away from destinations • Taking the stairs instead of elevators • Managing stress through breathing exercises or meditation • Bringing healthy snacks to work such as fruits, nuts and yogurt • Drinking water throughout the day
I eat a big bowl of cereal to break my fast after a full glass of water, drink water throughout the night and have a big as meal as possible with water and glass of milk to avoid heartburn.
Commenced house breaking by offering short walks throughout the day.dog is on free feed of dry and water to encourage some weight gain which was badly needed.
Construction Worker, Mission Renovation2015 — Present • Read blueprints and assign responsibilities to work crew accordingly • Prepare construction sites before crew comes out to make sure all hazards are removed • Measures distances to ensure remodeling and installations will fit perfectly • Erect scaffolding and other safety structures to reduce the number of workplace injuries by 80 percentConstruction Worker, Rose Falls Remodeling2013 — 2015 • Operated jackhammers to break up concrete to install pipes under the earth • Assisted masons, plasterers, and carpenters with specialty work • Cleaned surfaces before and after material was to be applied, which included hosing water, sand, or steam based on the material being worked on • Installed over 60 new roofs on residential houses throughout the city
Professional Experience SMC Construction (Irvine, CA) 05/2007 — Present Senior Project Superintendent • Supervise and managed subcontractors for a $ 4.2 million parking garage for LA Valley Collage • Perform demolition of the existing parking lot and construction of new 458 parking spaces • Install new lighting and «fire life safety» emergency phone system throughout the parking lot • Construct new storm drain system, Bio-swale, landscaping and new marquee signs • Oversee an $ 18 million construction project for the Ventura County Fire and Sheriff Academy Training Academy (FSTA) • Build single story, metal framed, 47,640 square foot of classroom building • Construct classrooms, fire lab, driving and shooting simulator rooms, library, offices, kitchens, multipurpose rooms, break rooms, and restrooms • Supervise and manage the construction of the Gold LEED Huntington Library • Oversee demolition of existing library in accordance with city regulations • Manage the construction of the $ 28 million Gold LEED Rieber Hall for UCLA • Direct team of more than 120 workers a day for refurbishment of 424 dormitory building • Ensure compliance with Title 24 and the latest code and building regulations • Perform asbestos abatement, installation of HVAC system with new boilers and ductwork, plumbing with Solar panels providing hot water to 24 bathrooms with multiple showers, toilets and sinks, and ADA compliant restrooms • Install electrical system with an emergency generator backup system, 4 traction elevators, windows, and curtain wall system • Completed project on schedule without disrupting the University's use of the 1st floor and exterior • Oversee the $ 5.6 million exterior renovation of the Anaheim Convention Center • Remove exterior walls on 3 sides of the building and install complex new curtain wall system in 20 bays • Maintain job site and public safety allowing use of the convention center during ongoing construction
a b c d e f g h i j k l m n o p q r s t u v w x y z