From 2016 to 2017, newly completed coal plants dropped by 41 per cent
while construction of new plants dropped by 73 per cent worldwide, according to a report by Greenpeace, the Sierra Club and CoalSwarm, released on Thursday.
Not exact matches
Darin Kingston
of d.light, whose profitable solar - powered LED lanterns simultaneously address poverty, education, air pollution / toxic fumes / health risks, energy savings, carbon footprint, and more Janine Benyus, biomimicry pioneer who finds models in the natural world for everything from extracting water from fog (as a desert beetle does) to
construction materials (spider silk) to designing flood - resistant buildings by studying anthills in India's monsoon climate, and shows what's possible when you invite the planet to join your design thinking team Dean Cycon, whose coffee company has not only exclusively sold organic fairly traded gourmet coffee and cocoa beans since its founding in 1993, but has funded dozens
of village - led community development projects in the lands where he sources his beans John Kremer, whose concept
of exponential growth through «biological marketing,» just as a single kernel
of corn grows into a
plant bearing thousands
of new kernels, could completely change your business strategy Amory Lovins
of the Rocky Mountain Institute, who built a near - net - zero - energy luxury home back in 1983, and has developed a scientific, economically viable plan to get the entire economy off oil, coal, and nuclear and onto renewables —
while keeping and even improving our high standard
of living
He said
while there were some disturbing signs — the loss
of 165 administrative jobs in August and
construction of a
new hot dog line at an Oscar Mayer
plant in Missouri — Madison
plant workers had been told they were doing a good job.
While the Green Party has always opposed the
construction of new fossil fuel projects such as the CPV power
plant in Orange County, Hawkins said that the recent corruption conviction
of Cuomo's former top aide required the state to rescind the permit for the
plant.
The number
of nuclear
plants under
construction is dropping steadily as projects are completed or abandoned
while hardly any
new ones take their place.
Given the nuclear solution requires
new reactor designs yet to be built even for demonstration and test purposes, and then the complexities
of siting nuclear power
plants near the calling water they need
while defending them against flood waters makes
construction of tested designs take a decade.
While these sections are relatively clear in describing how generation from nuclear
plants is accounted for in the emission rate goals, other parts
of the EPA proposal suggest the possibility that «
new» nuclear
plants beyond those currently under
construction may play a role in state compliance planning.
China,
while curbing domestic
construction of coal - powered
plants, has become a leading lender financing the
construction of new coal - burning power
plants in developing countries, according to a 2016 study by researchers at Boston University and the Institute for World Economics and Politics at the Chinese Academy
of Social Science.
It is completely logical for policy makers today to not support tearing down existing coal based power
plants,
while at the same time supporting the
construction of new power
plants that are both non CO2 emitting and cost effective.
Democrats and Republicans had, in the course
of a few short months, effectively switched policy positions on energy, with Democrats voting to hand trillions in
new subsidies to coal - burning utilities and power
plants while gutting Clean Air Act restrictions on the
construction of coal - fired power
plants, and Republicans, long - standing coal boosters, voting against a pro-coal bill.
Yet
while the monetary pathway offers a windfall
of cash, there's a catch: the funding only appears with the
construction of a
new power
plant.
And
while civilian light water reactors do not require that kind
of enrichment,
new nuclear
plants still start out with a huge carbon and energy debt to work off, which means it is years before they produce more energy than they consumed along the way (I have heard estimates exceeding 15 years when all the
construction and fuel cycle energy use is accounted for).