Prior to that,
wind additions came to a virtual stop in 2013 and through the first half of 2014 following the expiration, delayed renewal, and modification of the federal renewable energy production tax credit.
Not exact matches
The Hywind park
comes in
addition to Sheringham Shoal and the nearby Dudgeon offshore
wind farm, currently under development.
WIND MOBILE SHARES THE LOVE IN FEBRUARY WITH A SUITE OF NEW SMARTPHONES AND THE BEST PLANS TO TAKE ADVANTAGE OF THEIR FEATURES Highly - anticipated Galaxy Nexus by Samsung, BlackBerry Bold 9790, and BlackBerry Curve 9360 in white
come to
WIND TORONTO, ON — February 1, 2012 — On Friday, February 3rd, three of the most highly - coveted smartphones will be available at
WIND Mobile: the Galaxy Nexus, the world's first smartphone powered by Android 4.0, Ice Cream Sandwich; the BlackBerry Bold 9790, the lightweight, touchscreen + QWERTY
addition to the BlackBerry 7 lineup; and the BlackBerry Curve 9360, now available in white as well as in black.
In
addition to the charges for maintaining transmission & distribution infrastructure that Steve P. mentioned, and taxes & c, you need to multiply your figure by about 0.7, to account for the approximately 30 % of US power that
comes from nuclear, hydro, geothermal,
wind & c.
The worldwide growth of the
wind industry, in
addition to the number of turbines
coming off warranty, is leading to a vibrant — and valuable — aftermarket.
The most recent waves of generating capacity
additions include natural gas - fired units in the 2000s and renewable units, primarily
wind,
coming online in the late 2000s.
These latest purchases bring Microsoft's total purchase of
wind energy in the U.S. to more than 500MW, which is in
addition to the energy Microsoft purchases from the grid that
comes from
wind, solar and hydropower sources in the markets where we operate.
Approximately 40 % of the total 2012
wind capacity
additions (12,620 MW)
came online in December, just before the scheduled expiration of the
wind production tax credit (PTC).
If all planned
wind generators for 2012
come on line, as reported by industry participants,
wind capacity
additions could top 12,000 MW for this year.
As of November 30, 2012, the
wind capacity planned to
come on line by the end of December would account for approximately half of the total 2012
wind capacity
additions.
It says that, in
addition to
wind and solar, 12GW can
come from new and some already planned Combined Heat and Power projects by 2020 or perhaps earlier, 2.5 GW from biomass projects and 2.5 GW from conventional plant, plus 4GW from «additional energy efficiency measures»: it backs a serious domestic and industrial energy efficiency programme and the development of smart metering.
California's 228 MW of capacity
additions came from the Alta
Wind X and Alta Wind XI phases of the Alta Wind Energy Center (currently the largest wind farm in the United States at 1,548 MW of total capaci
Wind X and Alta
Wind XI phases of the Alta Wind Energy Center (currently the largest wind farm in the United States at 1,548 MW of total capaci
Wind XI phases of the Alta
Wind Energy Center (currently the largest wind farm in the United States at 1,548 MW of total capaci
Wind Energy Center (currently the largest
wind farm in the United States at 1,548 MW of total capaci
wind farm in the United States at 1,548 MW of total capacity).
In
addition to tea party congressional Republicans, opposition to continuing the
wind credit
comes from the American Energy Alliance, a Washington, D.C. - based industry group linked to petrochemical interests that promote expanded drilling for fossil fuels, including in the protected Arctic National Wildlife Refuge in Alaska, and approval of the proposed XL pipeline to bring Canadian tar sands oil to refineries in Texas and the Gulf Coast.
In
addition, the water is likely to get worse over the
coming week, as an expected Arctic cyclone's strong
winds and rain will loosen the ice coverage even further.