Not exact matches
Oskar Ström, RPh, PhDc, co-author
of the study said: «Our
model, based on Swedish costs and fracture risk data, shows that the widespread
implementation of FLS has the potential to prevent a large number
of fractures in Swedish patients with only a moderate cost per quality - adjusted life -
year.»
This progress report details the status
of these interrelated enhancements and the Large - Eddy Simulation (LES) ARM Symbiotic Simulation and Observation Workflow
model implementation project (now midway through its two -
year duration) at the Southern Great Plains site that is designed to bridge the scale gap between high - resolution ARM observations and large - scale climate
models.
After many
of years of experimentation and
implementation of various
models, what are some challenges that still remain?
Five
years ago, after observing the country's first district
implementation of a one - to - one technology program (one device per student) during a school tour in Mooresville, North Carolina, Leyden district administrators were inspired to replicate the
model in their own schools.
School officials developed the
model for most AUPs three or four
years ago, when widespread
implementation of the Internet in U.S. schools was in its infancy.
If three - fourths
of North Carolina's classrooms were to implement Opportunity Culture
models over one generation
of students — about 16
years of implementation — we projected, using conservative assumptions, that:
The intervention
models that have been generated in the past
year — and are currently in various stages
of development,
implementation, and testing — are based on approaches that have been heavily influenced by the biology
of adversity.
Since introducing the three targeted programs and
implementation model in 2016, Buchanan says the school has seen: improvements across a range
of classes using the NAPLAN writing scale
of up to 40 per cent; improvements in spelling using NAPLAN assessment and internal data
of up to two
years within a 12 month period; and its first spike in NAPLAN numeracy improvement for Years 3 and 5 (the two year groups staff focused on through the prog
years within a 12 month period; and its first spike in NAPLAN numeracy improvement for
Years 3 and 5 (the two year groups staff focused on through the prog
Years 3 and 5 (the two
year groups staff focused on through the program).
Though it will take several
years for full
implementation, Illinois becomes the 6th state with the EB
model as the basis
of its school funding structure.
Thus, we sought schools where specific practices in the PK — 3
years aligned with and accelerated promising turnaround efforts through the
implementation of the SIG
models.
«First
Implementation Year Study for the Correlation
of Value - Added
Model Scores, Average Scores on Marzano Elements, and Quality Ratings for Pedagogy»
See why Lyon County, Nevada, spearheaded by Deputy Superintendent Wayne Workman, chose the Marzano Teacher Evaluation
Model and the iObservation technology platform for its first
year of evaluation
implementation:
In accordance with this
model, the research efforts for the first two
years for each cohort focus on gathering baseline and formative data on the design and initial stages
of PICCS
implementation.
A second North Carolina district has joined its neighbor in implementing an Opportunity Culture: Three elementary schools and seven high schools in Cabarrus County, N.C., will pilot Opportunity Culture
models in 2014 — 15 — affecting approximately 1,000 students in the first
year of implementation alone.
CMS school design teams, which include teachers and school leaders, will integrate the new
models into 17 more schools this
year, and more schools will join the
implementation in each
of the two
years after that, with almost half
of the district's schools implementing by 2017 — 18.
Pinconning Middle School is currently in their third
year of implementation of the Focused Instructional
Model.
As director
of the National Centre for Excellence in the Teaching
of Mathematics (NCETM), an organisation that hyperactively co-ordinates maths activities — such as
implementation of the new maths mastery
model in primary schools — it's a good thing that the 51 -
year - old likes the subject so much.
This study evaluated 4
years of real - world
implementation of the Safe & Civil Schools PBIS
Model in a large urban school district.
Demonstration sites completed their first
year of implementation during the 2016 - 17 school
year and all five have scaled their blended
models to include more students and teachers implementing in
year two.
This evaluation
of the first two
years of the national demonstration
of ExpandED Schools (the 2011 - 12 and 2012 - 13 school
years) focused on the
implementation of TASC's
model and on strategies used by schools and community partners to scale up and institutionalize expanded learning.
Conducted by Policy Studies Associates (PSA), the evaluation
of the first two
years of the national demonstration
of ExpandED Schools (the 2011 - 12 and 2012 - 13 school
years) focused on the
implementation of TASC's
model and on strategies used by schools and community partners to scale up and institutionalize expanded learning.
After a
year of successful
implementation, Utah is expanding the Math - in - CTE
model to a regional format (North, South, and Salt Lake City) that spans the entire state.
Over the next two
years, we'll look across a diverse range
of schools» PL strategies to learn how early
implementation is going in classrooms and to identify the opportunities and challenges — both policy and practice — to expanding these isolated
models.
Will exit priority status after full
implementation of a three
year intervention
model and sustaining a 10 percent reduction in the percentage
of students not earning a standard or advanced diploma within a four
year period for two consecutive
years
Will exit priority status after full
implementation of a three
year intervention
model and meeting the participation rate for the «all students» for two consecutive
years
Will exit priority status at the conclusion
of implementation of the chosen three -
year intervention
model
A Tier I or Tier II SIG school will continue to be identified as a priority school if it meets Criterion B, C, or D at the conclusion
of the three -
year SIG
model implementation period.
Features the
implementation of the Parental Involvement Toolbox in your school community for a school
year and the metrics for parent engagement success based on our Logic
Model.
CUEL is conducting a 3 -
year impact and
implementation evaluation
of an innovative, job - embedded design for ambitious professional development for community - based early childhood educators in Chicago, based on the Ounce
of Prevention Fund's highly - regarded EduCare early childhood education
model.
During the first
year of implementation, Mineola launched a pilot using a highly personalized station rotation
model in 6th — 8th grade math classrooms at Mineola Middle School.The Mineola blended learning
models include targeted use
of small group time, data - driven instruction, goal setting, student progress ownership and transparency, increased choice and flexibility, and targeted attention to student attitudes towards math and learning.
Sustained
implementation of the Safe & Civil Schools PBIS
Model was signifi cantly associated with increased student academic achievement across nine
years.
The Ford Escape was put through a mid-cycle update for the 2017
model year, receiving Ford's first - ever
implementation of SYNC Connect, a host
of new driver assist features, and new EcoBoost engine choices.
For the 2017
model year, Toyota is expanding their
implementation of safety technology by offering a pre-collision system with pedestrian detection, radar cruise control, lane departure alert with steering assist and automatic high - beams on the Corolla.
Along with the Chevrolet Silverado, these
models are the first pickup trucks to receive the 5 - star NHTSA Overall Vehicle Score for safety since the
implementation of more rigorous requirements for the 2011
model year.
Its national energy regulator (NERSA) has announced new 20 -
year feed - in tariff rates that are greater than those in Germany (widely held as the
model of feed - in tariff
implementation) and Ontario: The tariff for wind power will be 1.25 ZAR / kWh ($ 0.14 / kWh).
Our practice has pursued the
implementation of the Carter
Model using solicitors and paralegals to provide such services to over 20,000 clients a
year — more than any other firm in the UK.
For the last six
years, Apple has favored this
implementation of USB syncing and charging in its line
of iPod shuffles, even as every other
model of iPhone, iPod or iPad shipped with a much bulkier 30 - Pin Apple Dock Connector.
Performed budgets, forecasts, financial analysis and systems
implementations for 600 multi-site retail stores Implemented JD Edwards accounting package including Accounts Payable, Accounts Receivable, General Ledger and Fixed Assets Performed corporate consolidations and currency conversions expressly for the United Kingdom, Europe and the Asian countries including Japan Performed product line profitability and new product launch analysis including the sub $ 1,000 personal computer estimated to be 30 %
of the 2000 annual operating plan Created a five
year strategic
model including P&L, cash flow, and balance sheet that provided significant impact to the organizationâ $ ™ s future growth and communication to the analyst community Developed financial statements and negotiated with portal and internet service providers to form Gateway.net and Gateway.com start up companies resulting in 1 million subscribers Supervised a staff
of ten full time financial analysts
SUMMARY Proactive, self - directed, result oriented Senior Business Analyst with around 9
years of experience in business requirements gathering and analysis, object - oriented design, data
modeling, systems development,
implementation & administration.
PROFESSIONAL SUMMARY Overall 11
years of IT experience - Teradata, Data
Modelling, Enterprise Data Warehousing, Big Data & ETL * Extensively worked on Architecture, Data Analysis, Design, Development,
Implementation, Maintenance and Support on RDBMS Systems and Big Data Technologies * Strong working experience in Financial, Healthcare, Entertainment Domains / Industries * Experience in Design, Enhancement, and Development
of...
PROFESSIONAL SUMMARY: * Microsoft Certified Technology Specialist with over 8 +
years of hands on experience on Microsoft Technologies and experience in analysis, design, developing, testing and
implementation of Web based Applications, Windows Applications and using Object Oriented programming
model using.
Tags for this Online Resume: System Development Life Cycle -LCB- SDLC -RCB-,, certificate, MSCE, Evaluation and
implementation of reports, Tech - Writing, Methodology
of OOA,
Year Award Recipient in New York 2000 from the NRCC Business Advisory Council,, Analysis, Design and Development
of various business applications, Data
Modeling Exp
Experience Summary: * 11 +
years of total experience in Business Requirements Analysis, Data Integration, Data Warehouse / Data Marts, Business Intelligence, ETL, Dimensional Data
Modeling, Coding, Development, Testing and
Implementation with RDBMS and non RDBMS.
SUMMARY: * 6 +
years of experience in IT industry and Data
Modeling, Database Design, Programming, Development and
Implementation of Client - Server Applications & Database systems using MSSQL 2012 / 2008R2 / 2008 / 2005/2000.
Professional Summary: A Oracle certified Professional with 9 +
years experience in Data
modeling, database design, Programming, Development and
Implementation of Client - Server Applications & Database systems oracle PLSQL development and UNIX technologies.
SUMMARY: * 6 +
years experienced in Data
Modeling, Relational Database Architecture and
Implementation, Systems Architecture and Development, Database Administration and implementation of Administrat
Implementation, Systems Architecture and Development, Database Administration and
implementation of Administrat
implementation of Administration Standards.
Summary: * Around 4
years of experience in all phases
of Software Development Life Cycle (SDLC), Agile & Test Driven development which includes User Interaction, Business Analysis /
Modeling, Design, Development, Integration, Planning and management
of Builds, Configuration, Code Management, Production / Customer Support, Maintenance, Enhancements and Quality Control, Testing,
Implementation, Documentation, in Custom Business S...
20 +
years Holding
of IT experience in diversified role which includes Techno - Functional Manager and Delivery Manager in SAP
Implementations Roll Outs Application Delivery System Integration Data Migration Upgrades and support maintenance Accounts with Multi-Geographical Delivery
model.
SUMMARY
OF EXPERIENCE About 16 years of experience in IT with expertise in Data Warehouse (ODS - DM - ETL), Oracle Data Base, Exadata Administration / Development, BI, Informatica, Data Modeling and in Analysis, Design, Development, Testing, Implementation and Maintenance of databases (including backup and recovery), PL / SQL, UNIX Shell Scripting, Reporting and front end application
OF EXPERIENCE About 16
years of experience in IT with expertise in Data Warehouse (ODS - DM - ETL), Oracle Data Base, Exadata Administration / Development, BI, Informatica, Data Modeling and in Analysis, Design, Development, Testing, Implementation and Maintenance of databases (including backup and recovery), PL / SQL, UNIX Shell Scripting, Reporting and front end application
of experience in IT with expertise in Data Warehouse (ODS - DM - ETL), Oracle Data Base, Exadata Administration / Development, BI, Informatica, Data
Modeling and in Analysis, Design, Development, Testing,
Implementation and Maintenance
of databases (including backup and recovery), PL / SQL, UNIX Shell Scripting, Reporting and front end application
of databases (including backup and recovery), PL / SQL, UNIX Shell Scripting, Reporting and front end applications.
PROFESSIONAL SUMMARY: 7
Years of total experience in the field
of Design, Product Development,
Modeling for Automotive, Aircraft Composites, structural parts, project coordination and
implementation of client requirements.