Not exact matches
Its
cost of construction, according to designers, is less than one - fifth that
of a subway, and could be completed in a
year.
Such factors include, among others, general business, economic, competitive, political and social uncertainties; the actual results
of current and future exploration activities; the actual results
of reclamation activities; conclusions
of economic evaluations; meeting various expected
cost estimates; changes in project parameters and / or economic assessments as plans continue to be refined; future prices
of metals; possible variations
of mineral grade or recovery rates; the risk that actual
costs may exceed estimated
costs; failure
of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks
of the mining industry; political instability; delays in obtaining governmental approvals or financing or in the completion
of development or
construction activities, as well as those factors discussed in the section entitled «Risk Factors» in the Company's Annual Information Form for the
year ended December 31, 2017 dated March 15, 2018.
End Illegal Immigration Act Fully - funds the
construction of a wall on our southern border with the full understanding that the country Mexico will be reimbursing the United States for the full
cost of such wall; establishes a 2 -
year mandatory minimum federal prison sentence for illegally re-entering the U.S. after a previous deportation, and a 5 -
year mandatory minimum for illegally re-entering for those with felony convictions, multiple misdemeanor convictions or two or more prior deportations; also reforms visa rules to enhance penalties for overstaying and to ensure open jobs are offered to American workers first.
We do this at a fraction
of the
cost, typically saving $ 100,000 per person, per
year on each project in contrast the extraordinary
costs of staff augmenting through an Engineering,
Construction or IT Professional Services firm.
As
of late last
year, Tishman was in the market for a $ 1.5 billion
construction loan for the project, though industry experts said it's unlikely that lenders would be willing to increase financing packages to cover additional steel
costs.
The taxable value
of a property is calculated as the cash value
of the land (the amount the land alone would sell for on the market), and the replacement
cost of all buildings minus depreciation
of 1.5 % per
year since
construction.
At the final stage
of production,
construction costs continued to contribute significantly to price inflation, rising by 2.4 per cent in the quarter and by 8.2 per cent over the
year.
It would jeopardize hundreds
of billions
of dollars each
year in new debt financing, and would push more
construction and labor
costs onto local taxpayers.
Southern has struggled over the past few
years with
cost over runs from the
construction of two new nuclear power plants (Vogle and Kemper).
House purchase
costs increased by 2 per cent in the June quarter and by 5 1/4 per cent over the
year, as ongoing strength in the
construction sector resulted in rising
costs of materials and labour.
They believe that the extra
cost of construction was paid back in savings from the first
year's utility
costs.
The
cost of construction is expected to be repaid inside five
years, then add profitability to the bottom line in perpetuity, says Oakey Beef Exports General Manager Mr Pat Gleeson.
In the wake
of Fletcher Building's full -
year result, analysts are asking whether strong housing
construction and an $ NZ100 million
cost - cutting program can offset the earnings drop - off as major projects come to an end.
The district wants to sell revenue bonds to pay
construction costs and, once the center is running, officials project that program fees and membership dues will cover expenses as well as earn an annual profit
of $ 235,000 within five
years.
The actual
cost for replacing the three - mile - long, 56 -
year - old bridge won't be known until the end
of the month, when four major
construction companies are due to submit bids to the state.
The last thing such power systems will need will be huge centralised power plants at the end
of the grid, not able to switch on and off, and having to be paid back over many
years for the huge upfront
cost of construction.
Construction experienced the highest rate
of insolvencies
of any industry in the second quarter, a sure sign that weak demand, extremely competitive pricing and rising
costs are all having a destructive effect on the industry which will continue to be felt for
years to come.»
If the
cost of construction is included, the Onondaga Lake amphitheater could lose more than $ 2 million a
year.
And whereas IDA sales tax abatements typically cover the
costs of construction materials and equipment purchased to initially outfit the building, Yahoo will receive the tax exemption on equipment purchases for 20
years.
A fiscal watchdog group is questioning the state's century - old prevailing wage law for
construction workers, saying it unnecessarily
costs taxpayers billions
of dollars a
year in added expenses for big road, bridge and other projects.
Each capital project request shall show: recommended priority; development; time schedule; estimated
costs for planning, site
of right
of way,
construction, equipment and other features; status
of plans and land acquisition; anticipated effect
of project on annual operating budget; possible sources
of financial aid; recommended expenditures by
years; and such other information as the Budget Director and Commissioner
of Environment and Planning may deem advisable.
The new Tappan Zee Bridge has been under
construction for three
years and is expected to be completed by 2018 at a
cost of $ 3.9 billion.
«This is four more
years of construction of this bridge and you need to know how much the bridge is going to
cost before you know what the tolls are going to
cost,» Cuomo said.
Moving the Thruway's portfolio to another entity has been talked about for
years: It was floated amid talk
of possible Thruway toll hikes, and bobbed to the surface again as the Thruway Authority began the
construction of the Tappan Zee Bridge replacement, which has an estimated
cost of $ 4 billion.
More than 4
years after Superstorm Sandy, homeowners are still struggling to return to their homes due to
construction and funding delays, and missing this deadline could mean that homeowners will lose their opportunity for reimbursement
of unexpected
costs related to elevation.
In signing the state's 2013 - 15 budget bill Sunday, Gov. Scott Walker left unchanged a tax increase that is estimated to
cost construction companies and other heavy users
of the state's unemployment fund millions
of dollars in the coming
years.
The project was delayed after
construction bids came in millions
of dollars over budget last
year, forcing officials to tweak some
of their designs for the building to lower
costs.
And it's going to
cost about 10 percent
of the
construction costs per
year to maintain them.
Then on 1 December NEON Inc., the organization currently working on the project, «submitted a revised
construction and operating plan that projected additional
costs and a further delay
of 2
years, according to NSF officials, which precipitated NSF's decision.»
However, it is important to note that the 1.8 percent increase may overstate the
year - to -
year trend because the $ 75.0 billion total includes approximately $ 1.2 billion in DOE to fully fund
construction costs for a number
of R&D facilities projects in advance.
In its 2017 budget request released earlier this
year, NSF sought $ 106 million to begin
construction of the two ships, and estimated a total project
cost of $ 255 million spread out over 3
years.
This month, Finland's Olkiluoto 3 nuclear reactor was supposed to begin generating power, a tangible sign
of the revival
of the nuclear industry outside
of Asia after nearly 30
years of no new
construction because
of accidents,
cost - overruns and other issues.
McCain would subsidize the
construction of 45 new nuclear reactors,
costing upward
of $ 270 billion and taking 20
years to complete.
Fusion has been a political football in recent
years because
of the exploding
cost of the U.S. contribution to ITER, the enormous international fusion experiment under
construction in Cadarache, France.
This six -
year collaboration, called the Engineering Design Activities, began in 1992, and exploratory discussions are now underway concerning
cost - shared, international
construction of this device.
Specifically, the bill would require NSF to reanalyze how much every large research project would
cost within the first
year of the start
of construction.
If a plant runs $ 5 billion in «overnight»
costs and the money is spent over five
years, interest on capital during the period
of construction — the utility's version
of a home builder's
construction loan — could add hundreds
of millions or even billions
of dollars.
The architectural conception and
construction of this high - tech facility took over 10
years and
cost $ 572 million.
The iconic Hubble Space Telescope, which was launched in 1990, has a total
cost of more than $ 10 billion including its
construction, launch and 20
years of operations.
EW: Although the trend has been to build bigger schools over the past 70
years to keep
costs down, do you think evidence from recent studies strongly favors the
construction of smaller schools, including middle schools similar to the size
of elementary schools?
Gore's plan creates grants and interest - free loans for urgent repairs and school
construction at a
cost of $ 8 billion over ten
years.
Here are a few examples: the for - profit company will install their own handpicked boards that in turn hire the company for «management,» and these fees routinely
cost up to 15 %
of the school's FTE; the for - profit company will demand that parents purchase supplies directly from the school itself, which is often another LLC that charges exorbitant rates for the basics; in many cases, the biggest part
of the scam is one LLC (e.g. Red Apple Development, the
construction arm
of Charter Schools USA) will purchase land to build the school on and then turn around and charge the school (read: taxpayers) rent that is substantially higher than the going rate / property value, sometimes as high as a million dollars a
year.
«In the past 9
years, the
cost of construction and private lease rates for the charter facilities market have risen astronomically, putting extreme financial pressure on public charter schools.
In order to keep the
construction and repair
cost of school buildings down, safety codes for public schools have not been revised in nearly 40
years (since 1971).
The bulk
of the aid increase proposed for next
year would be split in three ways: $ 408 million to reimburse schools for
costs such as transportation,
construction and BOCES services; $ 266 million for Foundation Aid, the main source
of funding for general school operations; and $ 189 million to partially restore the Gap Elimination Adjustment (GEA), a practice
of diverting promised funding from schools that began six
years ago to help the state deal with a budget shortfall at that time.
To further validate the accuracy
of both
of these data sets, 21CSF compared the school
construction capital outlay on the F - 33 to the total statewide
construction contract start
costs collected and reported by state and
year by Dodge Data & Analytics.
The Helix Architecture + Design team developed a creative plan to renovate the existing building and reduce the
cost of construction, all while still opening in time for the 2016 - 2017 school
year.
(A) the Federal share
of the
cost of construction thereof for a fiscal
year will not exceed an amount equal to 10 per centum
of the State's allotment for such
year,
(c) The Secretary is also authorized to make grants to assist in the initial staffing
of any public or nonprofit REHABILITATION facility constructed after the date
of enactment
of this section (whether or not such
construction was financed with the aid
of a grant under this section) by covering part
of the
costs (determined in accordance with regulations the Secretary shall prescribe)
of compensation
of professional or technical personnel
of such facility during the period beginning with the commencement
of the operation
of such facility and ending with the close
of four
years and three months after the month in which such operation commenced.
We sold the property in 2015 in less than 3
years during
construction period itself; upon considering Bank Interest as
Cost of Acquisition
of Asset — it turned out to be Short Term Loss.