The project extends for approximately 2,600 linear feet, north from the Hopkins / Smith intersection and consists of embankment stabilization and reconstruction, installation of a new closed drainage system, roadway reconstruction / rehabilitation, guiderail installation and site restoration. (www2.erie.gov)
«We do need to assess the risks of high scenarios, not just assume that [2 °C] guiderail is achievable, but the call for IPCC to give probabilistic information about different [scenarios] is just a non-starter,» Schmidt said in an email. (news.nationalgeographic.com)
The project also includes pavement repairs, highway striping, and the installation of new curbs and guiderails. (dnainfo.com)