Noting that surplus electricity — to the tune of 38 TWh by 2050 — reserve power, and ancillary services would be Germany's foremost challenges over latter period of the transition, Hobolm suggests 7 GW to 12 GW of new interconnectors between Germany, Norway, and Sweden, of mutual economic benefit, could be built so that about 10 TWh to 20 TWh (26 % to 52 %) of Germany's surplus electricity could be stored there. (powermag.com)
But with the footballing impact of his legacy so frontloaded, this long latter period has been strange and at times uncomfortable. (sbnation.com)
«We also split the data pre and post 2010 with the latter period seeing these numbers fall to an average of 2100 days and 210 days respectively.» (businessinsider.com)