The bridge floor framing system consists of a finished architectural topping slab over a structural concrete slab on a composite metal deck spanning between steel beams. (mmaltzan.com)
The sliver is made of prefabricated steel hoops enclosed with metal decking and then clad with flat - lock, stainless steel shingles. (treehugger.com)
«Namely a hard and very difficult - to - remove yellow glue which was discovered underneath the spray - on - fireproofing on the majority of the existing steel and metal decking on the project.» (thealt.com)