This year was the first year that the auction implemented controversial rules that
require generation resources to be available year - round.
«If there is a limiting factor in renewable power growth, it will be the inability to add enough transmission lines to accommodate new wind, solar and other
renewable generation resources,» [a NERC director of reliability assessments] said.
The title, «Levelized Cost and Levelized Avoided Cost of
New Generation Resources in the Annual Energy Outlook 2016,» tells you all you need to know.
He says
other generation resources ready to come online by 2021 will help generate more than enough electrical power to replace Indian Point's capacity.
Transmission upgrades and efficiency measures already are in service, Cuomo said, adding that other
generation resources ready to come online by 2021 will help generate more than enough electrical power to replace Indian Point's capacity.
«A diverse mix of
power generation resources, including those with on - site reserves, is essential to the reliable delivery of electricity — particularly in times of supply stress such as recent natural disasters.
The press release notes that «
several generation resources are also fully permitted and readily available to come online by 2021, after the plant's closure, including clean, renewable hydropower able to replace up to 1,000 megawatts of power.»
Because of its dispatchability; the model factored in CSP with thermal storage as equivalent to fossil - fueled non-fluctuating
generation resources like coal or gas.
Ajay Arora, vice president of environmental services and
generation resource planning at Ameren, said that the company is working to meet greenhouse gas reduction goals similar to the standards set in the Clean Power Plan and is investing in renewable energy, but it does not agree with the Environmental Protection Agency's approach.
«During our assessment of long - term
generation resource needs, we have found a good fit with Duke's Los Vientos V wind project,» said BTU Board of Directors Chairman Carl Benner.
Consistent with New York's Reforming the Energy Vision initiative, the New York Independent System Operator today announced new market rules that will enable certain on -
site generation resources to participate in New York's wholesale electricity markets.
«If the state is focused on reducing CO2 emissions, the clean energy standard should apply to Indian Point which is an
essential generation resource critical to the state's goal of reducing CO2 emissions,» said Tammy Holden, speaking for Entergy.
Doing the same other
generation resources including coal, natural gas and nuclear — estimating land use via huge sample sizes — would help inform decisions, Denholm said.
American Electric Power announced Sept. 10 that 7,209 MW of the company's unregulated generation fleet in the PJM Interconnection market cleared the capacity auction for the 2018 - 2019 delivery year, representing all of the capacity that
AEP Generation Resources bid into the auction.
Hydropower generation resources are clustered unevenly around the country, with over half of U.S. hydro capacity concentrated in three States: Washington, Oregon, and California.
The state is facing resource adequacy concerns as well as the need for more
flexible generation resources to help complement more variable - output renewable resources, particularly solar, being added to the system.
Energy savings from customer energy efficiency programs are typically achieved at 1/3 the cost of new
generation resources Efficiency programs can also reduce the need to install, upgrade or replace transmission and distribution equipment.
Stranded assets are now generally accepted to be fossil fuel supply and
generation resources which, at some time prior to the end of their economic life (as assumed at the investment decision point), are no longer able to earn an economic return (i.e. meet the company's internal rate of return), as a result of changes associated with the transition to a low - carbon economy.
At WSP, we consider all potential contributions to sustainability, using our extensive knowledge in assessing energy sources, energy management, and potential challenges of
connecting generation resources to the electrical grid.
As TVA's current 2015 IRP process continues, SACE is hopeful that TVA will announce significant investments in renewable energy
generation resources when the final IRP is released in the Spring of 2015.
Advanced grid support functionalities of smart inverters and energy storage systems are critical to reliably operate the power system with higher penetration of
variable generation resources like PV.»
«An additional condition not illustrated in the graph is the variability within the hour, because of passing clouds or storms that interrupt the output of the wind and
solar generation resources,» he said.
The OPA had procured new
generation resources through competitive requests for proposals and small renewable projects through the Renewable Energy Standard Offer Program («RESOP»).
TEST ENGINEERING (15 + years) Test Specification Interpretation and Test Plan
Generation Resource Management and Fiscal Responsibility A.T.E. Test Programming and Test Fixture Design & Fabrication C, CTL, B...
These policy actions include new legislation requiring long - term contracting for renewables and other resources in Massachusetts, Connecticut, and Rhode Island, revised incentives for
distributed generation resources, changes to RPS polices in other states in New England, proposed Massachusetts - specific CO2 caps, and newly - revised forecasts for electricity sales that take the full impact of new energy efficiency measures into account.
She writes for an online resource that gives advice on topics including payroll processing for
lead generation resource, Resource Nation.
Apart from the reliability question (see the next item), this is a capacity question: can Maryland build the needed
generation resources in - state and contract for the needed resources from outside the state to meet the renewable electricity targets in the 100 % Act?
Several generation resources are also fully permitted and readily available to come online by 2021, after the plant's closure, including clean, renewable hydropower able to replace up to 1,000 megawatts of power.